Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment

Journal Title: Journal of Fuzzy Extension & Applications - Year 2020, Vol 1, Issue 3

Abstract

In this paper, we have developed the multi-item inventory model in the fuzzy environment. Here we considered the demand rate is constant and production cost is dependent on the demand rate. Set-up- cost is dependent on average inventory level as well as demand. Lead time crashing cost is considered the continuous function of leading time. Limitation is considered on storage of space. Due to uncertainty all cost parameters of the proposed model are taken as generalized trapezoidal fuzzy numbers. Therefore this model is very real. The formulated multi objective inventory problem has been solved by various techniques like as Geometric Programming (GP) approach, Fuzzy Programming Technique with Hyperbolic Membership Function (FPTHMF), Fuzzy Nonlinear Programming (FNLP) technique and Fuzzy Additive Goal Programming (FAGP) technique. An example is given to illustrate the model. Sensitivity analysis and graphical representation have been shown to test the parameters of the model.

Authors and Affiliations

Satya Kumar Das

Keywords

Related Articles

New Plithogenic sub cognitive maps approach with mediating effects of factors in COVID-19 diagnostic model

The escalation of COVID-19 curves is high and the researchers worldwide are working on diagnostic models, in the way this article proposes COVID-19 diagnostic model using Plithogenic cognitive maps. This paper introduces...

Precise services and supply chain prioritization in manufacturing companies using cost analysis provided in a fuzzy environment

In recent years, management and, consequently, supply chain performance measurement, has attracted the attention of a large number of managers and researchers in the field of production and operations management. In para...

Assessment and linear programming under fuzzy conditions

The present work focuses on two directions. First, a new fuzzy method using triangular / trapezoidal fuzzy numbers as tools is developed for evaluating a group’s mean performance, when qualitative grades instead of numer...

Evaluation and selection of supplier in supply chain with fuzzy analytical network process approach

One of the most important issues concerning the designing a supply chain is selecting the supplier. Selecting proper suppliers is one of the most crucial activities of an organization towards the gradual improvement and...

Spherical interval-valued fuzzy bi-ideals of gamma near-rings

In this paper we introduce the concept of the spherical interval-valued fuzzy bi-ideal of gamma near-ring R and its some results. The union and intersection of the spherical interval-valued fuzzy bi-ideal of gamma near-r...

Download PDF file
  • EP ID EP692660
  • DOI 10.22105/JFEA.2020.254081.1025
  • Views 157
  • Downloads 0

How To Cite

Satya Kumar Das (2020). Multi item inventory model include lead time with demand dependent production cost and set-up-cost in fuzzy environment. Journal of Fuzzy Extension & Applications, 1(3), -. https://europub.co.uk/articles/-A-692660