Metro Turnout Short-term Action Overload Early-warning Method Based on Multi-description Complementary Prediction
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 1
Abstract
[Objective] Metro turnback turnouts undergo frequent movements and complex working conditions, making them prone to overload actions that lead to mechanical failures such as jamming and blockage. A method for predicting short-term action loads and assessing overload early-warnings is proposed. [Method] Focusing on metro turnout short-term action overload early-warning, research is carried out expounding the assessment method for turnout short-term state early-warnings. Utilizing the proposed multi-description weighted prediction mechanism and adaptive kernel density estimation, the approach to achieve interval prediction of action loads and the calculation of early-warning assessment indicators are described, and the early-warning assessment process is outlined. Based on this, an application plan for action overload early-warning is established and empirically tested using turnout action data from Wuhan Metro. [Result & Conclusion] First, real-time continuous collection of turnout power curve characteristic points is conducted, and the root mean square value is calculated to obtain the characteristic sequence of turnout action loads as the input for prediction. Then, a multi-description complementary prediction mechanism is designed, using ELM (extreme learning machine) as the base predictor to establish a multi-description complementary prediction machine to carry out multi-step range prediction of short-term action load characteristics, forming a prediction feature set. Lastly, taking the elements of the prediction feature set as samples, the probability density function and the overall value confidence interval of the turnout action load characteristics during the prediction period is calculated using an adaptive kernel density estimation method. Combining this with the confidence interval of historical load characteristics, the action overload degree during the prediction period is defined as the early-warning assessment indicator. Empirical test results show that for pre-fault load characteristic data, the coverage rate of the estimated confidence interval by prediction reaches 94.2%, and the confidence interval width generally matches the actual value interval width changes. When the early-warning assessment threshold is set at 0.63, all test cases can successfully issue early-warnings during the 4th to 9th actions before turnout faults occur. The test results validate the effectiveness of the overload early-warning method.
Authors and Affiliations
Hao WEN, Rui HUANG, Guangxiang XIE
Coasting-cruising Combined Control Strategy Based on Train Energy-efficient Operation
Objective Current train operation control system incorporates an automatic driving subsystem, enabling train cruising control. To further reduce train operational energy consumption while maintaining service quality, it...
Design and Verification of Safety Monitoring Device for Emergency Braking of Beijing Subway Capital Airport Line Vehicles
[Objective] To reduce friction brake wear and ensure emergency braking performance under electric braking, a safety monitoring device based on a two-stage emergency braking control is installed on Beijing Subway Airport...
Research on Coverage Scheme and Key Technology of Wireless Communication for Cover Development of Urban Rail Transit Parking Lot
[Objective] The cover development design for urban rail transit parking lot is very complicated, requiring more new column grids. Moreover, after the cover development, the omnidirectional antenna set up on the roof of t...
Urban Rail Transit Regional Collaborative Management Mode Based on Shanghai Resilient City Construction
Objective The regional collaborative management of urban rail transit (URT) is explored to assist in the construction of Shanghai resilient city. Research is carried out specifically on the collaborative management mode...
A Design for Guideway Rubber-tyred Tram Vehicle Base without Turn-back Operation
Objective Vehicle base serves as a place for parking and maintenance of guideway rubber-tyred trams. Vehicles are traveling on complex routes and operating turn-back frequently within the base. Since guideway rubber-tyre...