Stability Analysis of Jinan Qixiuchang Metro Station during the Foundation Pit Temporary Supports Dismantling
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 6
Abstract
Objective It is prone to lose stability, affecting the engineering safety in the process of dismantling the supports for metro station deep and large foundation pit. Therefore, it is necessary to analyze the stability in the above process. Method Based on the deep and large foundation pit project of Jinan Qixiuchang Metro Station, on-site monitoring and three-dimensional numerical simulation are used to study the deformation characteristics and the dynamic evolution of mechanical response during deep and large foundation pit excavation and the supports dismantling, focusing on problems like supporting axial force, deformation of underground diaphragm wall and land subsidence. Result & Conclusion When the excavation is completed, the depth point where the underground diaphragm wall shows the maximum horizontal displacement is 0.7~0.8 times the total excavation depth. After the bottom steel support is removed, the diaphragm wall deformation accelerates and the axial force of the first support increases by 4 to 6 times. In order to ensure the construction safety, the unsupported time should be reduced as short as possible. The main ground area affected by foundation pit construction ranges from 0 to 20 m, and should be the focus of monitoring. On-site monitoring results verify the effectiveness of the numerical simulation.
Authors and Affiliations
Deliang HE
Application of Grouting Method for Underground Excavation Construction of Urban Rail Transit Connecting Passage in Water-rich Sandy Cobble Stratum
Objective Connecting Passage 1 in the interval of Jiujiang North Station and Longqiao Road Station of Chengdu Metro Line 19 Phase II is located in water-rich sandy cobble stratum. Limited by the location of the surroundi...
Seepage Point Impact in Urban Rail Transit Station Foundation Pit Enclosure Structure on the Variation Law of Surrounding Groundwater Seepage Field
Objective In terms of underground engineering construction accident causes, approximately 20% of foundation pit accidents are caused by water seepage through enclosure structures. Such seepage can lead to significant def...
Adhesion Control Method for EMU
Objective Given the high operating speeds, minimal residual acceleration margin, and open-air track conditions of EMU (electric multiple units), as well as the deficiencies in conventional combination correction methods...
Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is...
Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation
Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order...