A FUZZY BASED APPROACH FOR EARLY REQUIREMENT PRIORITIZATION

Journal Title: INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY - Year 2016, Vol 15, Issue 2

Abstract

The importance of the prioritization in commercial software development has been analyzed by many researchers. The gathered requirements are required to be put into an order of some priority. In other words we can say that there is a need to prioritize the requirements. It is evident that most of the approaches and techniques proposed in recent research to prioritize the requirements have not been widely adopted. These approaches are too complex, time consuming, or inconsistent and difficult to implement In this paper we propose a fuzzy based approach for requirement prioritization in which  requirement are prioritized in early phase of requirement engineering as post elicitation step. This category of prioritization is known as early requirement prioritization. The proposed fuzzy based approach considers the nature of requirements by modeling their attributes as fuzzy variables. As such, these variables are integrated into a fuzzy based inference system in which the requirements represented as input attributes and ranked via the expected value operator of a fuzzy variable.

Authors and Affiliations

Mohd Muqeem, Dr. Md. Rizwan Beg

Keywords

Related Articles

Comparative Analysis Domino Logic Based Techniques For VLSI Circuit

Domino logic is a CMOS-based evolution of the dynamic logic  techniques  based  on  either  PMOS  or  NMOS transistors. Domino logic technique is widely used in modern digital VLSI circuit. Dynamic logic is twice...

A Review of Security Threats by The Unauthorized in The E-Learning

Computers have become an integral part of our everyday existence. They are used to store and to send among students’ letters and sensitive documents, materials. In today's focused world, each Organization is endeavorin...

Enhancing the Performance of the BackPropagation for Deep Neural Network

The standard Backpropagation Neural Network (BPNN) Algorithm is widely used in solving many real problems in world. But the backpropagation suffers from different difficulties such as the slow convergence and convergence...

THE CHALLENGE OF IMPLEMENTING SCRUM AGILE METHODOLOGY IN A TRADITIONAL DEVELOPMENT ENVIRONMENT

Agile software development management is gradually gaining more profile and followers among technology companies. The current article presents a study on agile methodologies in contrast to traditional methodologies as we...

Nano Topological Analysis For Power System Control

In this paper,we introduce an approach for analysis of information concerning electrical power system. The suggested method is a result of hybridizing rough set concepts with nano topology constructed on the set of all d...

Download PDF file
  • EP ID EP650777
  • DOI 10.24297/ijct.v15i2.566
  • Views 94
  • Downloads 0

How To Cite

Mohd Muqeem, Dr. Md. Rizwan Beg (2016). A FUZZY BASED APPROACH FOR EARLY REQUIREMENT PRIORITIZATION. INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY, 15(2), 6480-6490. https://europub.co.uk/articles/-A-650777