A Knotworking Guideline for Building Projects: Bridging the Gap between Participants
Journal Title: International Journal of engineering Research and Applications - Year 2017, Vol 7, Issue 6
Abstract
The high level of complexity in today‟s building design requires a high level of multidisciplinary collaboration, which historically is uncommon in the Architecture, Construction and Engineering (AEC) sector. While the AEC sector accepts the requirement of collaboration, lack of knowledge on how to collaborate occurs. The Finnish method, Knotworking AEC, emphasises both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC, why three experiments were conducted to gain knowledge about how Knotworking is utilised in practice. Through a practice theoretical perspective, data was collected from existing literature and participant observation of two experiments. Subsequently, the practices and contradictions of the three experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the result lies in the conduction of a Knotworking session from both a practical and research perspective to, respectively, enrich the AEC sector and the concept of Knotworking AEC.
Authors and Affiliations
Mai Brink Rasmussen, Anne Nørkjær Gade, Rasmus Lund Jensen
Real Time Image Fusion using Multi Resolution Discrete Sine Transform
Image fusion is a process, used to fuse two or more images into one image without any loss of data, images are taken from different sensors in different Field Of View (FOV). In recent days, image fusion is playing an imp...
Cohesión social en Ciudad Juárez, Chihuahua, México en tres fraccionamientos al suroriente de la ciudad.
.
Q(A) – Balance Edge Magic Graphs
In this paper Q(a)- BEM graph is discussed the following graphs are Cycle graph, Ladder graph, Windmill graph and Gear graph. If G is a (p,q)- graph in which the edges are labeled 1,2,3,…..q so that the vertex sums are c...
Design of Data Aquistion interface circuit used in Detection Inter-turn Faultin Motorbased onMotor Current Signature Analysis (MCSA)Technique
A commitment to condition monitoring involves the operators of plant in the conduct of a range of activities. These activities may be complicated in nature and indeed may often be performed automatically under computer c...
Static Analysis of Bridge Structure using Finite Element Analysis Software
Finite element analysis is an effective method of determining the static performance of structures for three reasons which are saving in design time, cost effective in construction and increase the safety of the structur...