A Review of Application of Risk Management Techniques in Costing and Evaluating Construction Work Projects in Nigeria: A Mathematical Analysis Approach

Journal Title: Current Investigations in Agriculture and Current Research - Year 2018, Vol 5, Issue 4

Abstract

There exist some inherent risk elements like physical risk, environmental risk, logistic risk, financial risk, legal risk, political risk, etc. in the construction work environment in Nigeria. Before now those costing these projects use only contingency sum approach and insurance cover without properly taking into consideration all these other critical factors of risk. The result is that most contract projects that border on, construction works were either over-valued or under-valued with their consequent rising cost implications, before execution contract agreement is signed. The present paper used secondary data compiled by a Consultant Quantity Surveyor to carry out some evaluation tests and analysis through the use of an established model that combined material cost (M), labour cost (L) and Plant cost (P) to arrive at a total “best” construction cost estimates (TCCE). That is, TCCE = M+ L + P. Major objectives the paper tried to achieve, are: [1] possibility of using risk management techniques, namely; risk identification, risk analysis and risk response, to ascertain cost variables that could combine to give an optimum cost estimate in order to avoid cost over-runs in construction work project, [2] To ascertain their applicability in Nigerian, in addition to, use of cost effectiveness, cost-benefit analysis and sensitivity analysis (simulation) methods in evaluating and determining the viability of government Projects/Programs in Nigeria. Results from the study confirmed our convictions that it was possible to find total “best” construction cost estimates through an established model that incorporated most key risk factors (variables) inherent in projects as well as use qualitative evaluation techniques to access government project and programs. It is therefore recommended that investors and all stakeholders to construction work project contracts always use a model that captures or incorporates key indicators of risk to arrive at total best construction cost estimates so as to avoid cost over-runs in project execution and outright abandonment

Authors and Affiliations

Sebastian O Uremadu, Francis Okafor O, Charity E Duru Uremadu

Keywords

Related Articles

Observations on Plant Health Clinic: Diversification for Strengthening Food Security

Due to unabated rise in population, more so in Afro-Asian and Latin American countries food security has become a matter of concern. It is expected that global population may reach 10 billion and therefore globally all e...

Impact of Some Fertilization Treatments on Crop and It’s Atrebuites on “Fuerte” Avocado Trees

This study was carried out throughout two successive seasons 2015 and 2016 at Horticulture Research Station at El-Kanater El-Khayria, Qalyubeia Governorate on 20-year-old avocado trees (Persea americana Mill.) “Fuerte” c...

Fresh Water-an Emerging Global Concern with Special Reference to India

The world population was 2.5 billion in 1950, 4.4 billion in 1980, 6 billion in 2000 and projected to grow to 8 billion in 2025 and further likely to increase to 9.3 billion in 2050. Majority of this growth will occur in...

Farmer’s Perspective on Importance and Constraints of Seaweed Farming in Sri Lanka

Seaweed cultivation is identified as a catalyst for social progression in coastal communities. Despite the potentials, the seaweed cultivation introduced to resettled coastal districts in Sri Lanka seems not performing t...

Effect of Host Plants on The Reproductive Aspects of Cheilomenes sexmaculata (Fabricius) (Coleoptera: Coccinellidae)

The feeding and reproductive potential of predators are greatly influenced by plants due to direct effect on prey quality. Aphis craccivora Koch (Hemiptera: Aphididae) is a sap sucking insect and one of the major pests o...

Download PDF file
  • EP ID EP573848
  • DOI 10.32474/CIACR.2018.05.000216
  • Views 66
  • Downloads 0

How To Cite

Sebastian O Uremadu, Francis Okafor O, Charity E Duru Uremadu (2018). A Review of Application of Risk Management Techniques in Costing and Evaluating Construction Work Projects in Nigeria: A Mathematical Analysis Approach. Current Investigations in Agriculture and Current Research, 5(4), 689-696. https://europub.co.uk/articles/-A-573848