A Study and Analysis of Bot Project Performance Using Time Impact Analysis

Abstract

Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of producing good quality construction work within the specified duration. Monitoring continuously the interactive relation concerning delays in construction schedules and contractor demands is a complicated process. Here the simplest and basic approach is that, both for owner and contractor, time is money and for this reason construction schedule delays should be analyzed and corrective measures should be taken in a timely manner. The main purpose of this study is to investigate the causes of construction schedule delays and the methods of schedule delay analyses. The “Time Impact Analysis Method” (TIA) was applied to the case study project using MSP software in order to determine the construction schedule delays; to measure the impacts of these delays on the project completion duration; and to allocate responsibility amongst the project participants for preventing delay claims.

Authors and Affiliations

S. Binil Sundar, J. Renuga

Keywords

Related Articles

Web GIS Architecture Based on JNLP & some Performance Improving Techniques

WebGIS (also known as web‐based GIS and Internet GIS) denotes a type of Geographic Information System (GIS), whose client is implemented in a Web browser. By analyzing the defects of two tier and three tier client/serve...

Auto Metro Train Shuttle between Stations

The main aim of this project is to demonstrate the technology used in metro train movement which are used in most of the developed countries. This train consists of a controller that enables the automatic running of the...

A Study On Financial Performance Of Cement Companies In India With Reference to Ultratech Cement Limited and OCL India Limited - A Comparative Analysis

India is the second largest producer of cement in the world. Cement production increased at a compound annual growth rate (CAGR) of 9.7 per cent in the period 2006– 2013, producing 272 million tonnes (MT). In this study...

A Study on Factors Influencing Quality of Construction Projects

he construction industry plays a vital role in the economy. The construction industry is complex in its nature because it comprises large numbers of parties as owners (clients), contractors, consultants, stakeholders, a...

Evaluation and Analysis of Road Traffic Noise on a National Highway

Noise pollution has been well recognized as one of the major cause of concern that impacts the quality of life in urban areas across the globe. Traffic noise from highways creates problems in the surrounding areas spec...

Download PDF file
  • EP ID EP22038
  • DOI -
  • Views 175
  • Downloads 4

How To Cite

S. Binil Sundar, J. Renuga (2016). A Study and Analysis of Bot Project Performance Using Time Impact Analysis. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 4(4), -. https://europub.co.uk/articles/-A-22038