A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

Abstract

Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by simply changing the way to manage multi-projects. The second is from academia: some scholars have claimed that the ideas of CCPM are not new and are of no substantial contribution to Project Management Body of Knowledge (PMBOK). In this study, we first used multi-project management games to overcome the first obstacle. A comparative study of CCPM and Program Evaluation and Review Technique/Critical Path Method (PERT/CPM) planning methods, excluding bad human behaviors, was then conducted to overcome the second obstacle. The simulation results show that: (1) the “mode of managing multi-projects” was the root cause, and changing the mode of managing multi-project could significantly improve OTD and PLT; (2) in terms of mean project time, CCPM is not significantly better than PERT/CPM. However, in terms of plan reliability, CCPM achieves higher than PERT and CPM. This is due to a CCPM logistical change that generates a more reasonable and reliable project plan than do the PERT/CPM methods.

Authors and Affiliations

Chia-Ling Huang, Rong-Kwei Li, Chih-Hung Tsai, Yi-Chan Chung, Yao-Wen HSU

Keywords

Related Articles

Problems of Management Accounting Implementation. The Case of Balanced Scorecard Implementation within Jordanian Commercial Banks

This study aimed to find the status of Balanced Scorecard implementation in Jordanian Commercial Banks and the most barriers and problems of BSC implementation in these banks. The results indicated that the Jordanian ban...

In Pakistani Service Industry: Dividend Payout Ratio as Function of some Factors

The purpose of this paper is to find that dividend payout ratio is the function of Corporate Profitability, Cash Flow, Tax, Sales Growth and Debt to Equity ratio. For seeking out the dividend payout ratio relationship of...

Fiscal Policy and Economic Growth. An Examination of Selected Countries in sub-Saharan Africa

The debate on the effectiveness of fiscal policy as a tool for promoting growth and development remains inconclusive given the positions of economic theories as well as conflicting results of past studies. This study sou...

A Review of Bankruptcy and its Prediction

Bankruptcy is one of the key issues across the globe which influences the economy of all the countries. Heavy social and economic costs which are imposed by bankrupted companies on stockholders can cause motivation of re...

Capital Adequacy, Cost Income Ratio and the Performance of Saudi Banks (2007-2011)

This paper examines the relationship between Capital adequacy and profitability. Necessary data were gathered from the financial statements of nine Saudi banks listed in the stock exchange market over the period of 2007-...

Download PDF file
  • EP ID EP131266
  • DOI 10.6007/IJARAFMS/v4-i1/505
  • Views 107
  • Downloads 0

How To Cite

Chia-Ling Huang, Rong-Kwei Li, Chih-Hung Tsai, Yi-Chan Chung, Yao-Wen HSU (2014). A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment. International Journal of Academic Research in Accounting, Finance and Management Sciences, 4(1), 21-35. https://europub.co.uk/articles/-A-131266