Advanced Prediction Method for Shield Tunneling Cutterhead Torque Based on WaveNet Network
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7
Abstract
Objective Cutterhead torque is a crucial parameter that characterizes the safety of shield tunneling and the operating status of equipment. To address the difficulties in cutterhead torque prediction and excavation parameters timely correction, an advanced prediction method for shield tunneling cutterhead torque based on WaveNet network is proposed. Method The preprocessing method for working condition data is introduced, and the basic structure and construction method of the initial static model based on WaveNet network are proposed. A training set is constructed by extracting historical data of shield construction monitoring within the initial 50 m tunneling distance, and advanced prediction of the cutterhead torque is made after five construction steps based on the shield construction monitoring data of the previous 20 construction steps. With the increase of shield excavation distance, the model is retrained and updated every five construction steps using newly generated data set, thus a long-term dynamic model for cutterhead torque advanced prediction is proposed. Taking the left-line data of the Yufuhe Sta.-Wangfuzhuang Sta. shield tunnel interval of Jinan Rail Transit Line 1 as example, the prediction effect of cutterhead torque is analyzed and verified. Result & Conclusion The cutterhead torque values by advanced prediction for the first 50 m tunneling distance show a basic consistency with the changing trend of actual values, with an average relative error of 10.07%. The initial static model exhibits relatively high prediction accuracy. As the tunneling distance increases, the relative error of the initial static model increases from 10% to about 30%, while that of the continuously updated long-term dynamic model remains stable at around 10%. The update time of the long-term dynamic model is generally distributed between 1 and 6 seconds, with an average time consumption of 3.92 s, meeting the requirement for efficient dynamic model updates.
Authors and Affiliations
Bozhi WANG, Shuang DING, Yongliang HUANG, Wenming CHEN, Hao XIE, Zihui PENG, Weifeng WU, Jiaye WANG
Research on Application of Urban Rail Transit Network-Level Power Dispatching System
[Objective] With the increasingly clear trend of network construction in urban rail transit, the line-level power dispatch system, as the core business of urban rail transit, is receiving more and more attention on its...
Feasibility Study on Safety Protection Technology of Lithium Titanate Battery for Urban Rail Transit Vehicles
Objective Safety issues such as short circuit, thermal runaway, and resulting explosion of lithium-ion batteries have become one of the bottlenecks for the application and development in urban rail transit vehicles. Ther...
Impact Analysis of Wall-Caisson Composite Structure Construction Adjacent to Rail Transit Bridge
[Objective] The construction deformation control adjacent to operational railways is of utmost importance in current rail transit planning and construction. Therefore, it is necessary to study the effect of the diaphragm...
Personnel Intrusion into Construction Area Warning System Based on RFID and Binocular Vision in Vehicle Base
Objective Construction management at urban rail transit vehicle bases typically relies on work permission and work closure method to control construction safety. However, there is a lack of real-time protective technolog...
Calculation Method of Crowd Density in the Local Area of Subway Station Platform
[Objective] The calculation method of crowd density is the key to analyzing the risk of crowd gathering on subway station platforms. Usually, the internal density distribution is uneven when it is crowded, and there ar...