An Approach for Engineering Tuning of Smith Predictor with Dynamic Object from High Order
Journal Title: International Journal of Engineering Innovations and Research - Year 2018, Vol 7, Issue 5
Abstract
An approach is proposed for engineering tuning of Smith predictor with a dynamic object from high order. There is a proposal to solve the problem by solving the characteristic equation (controller-compensator). As a result of the high order dynamic system analysis, the tuning parameters of the Smith predictor are calculated. The transitionĐ°l processes of the system (controller-compensator) are dealt with by assignment. For the transitional process by assignment, overshoot occurs. If a comparison of the overshoot of the transitional process by assignment (obtained in simulation) is made, 0,1 % inaccuracy is observed in theory. Therefore, the proposed approach for engineering tuning of Smith predictor with a high order dynamic object is suitable for use in high order dynamic systems analysis.
Authors and Affiliations
Georgi Petrov Terziyski, et al.
Application and Design of Regional Geothermal Heating System Design for Citgol Municipality
In this study; the project design and application of regional heating system with geothermal energy in Citgol Municipality which has population around 4000-people were performed. It was accentuated on project management...
Scale Development to Assess Instructors’ Intention to use Technology and E-Learning in Libyan Higher Education
This paper describes the development an instrument to assess faculty intention to use technology and e-learning in Libyan higher education (LHE). In spite of the research that has been conducted to examine the factors th...
Prediction of RNA 3D Structure
RNA structures are generally organized hierarchically organized. Prediction of RNA structure is a big challenge for the researchers. Many prediction algorithms have been develop for RNA secondary stru...
Developed Regression Models of Mining Rate Fit on Resource and Reserve Variations in Gold Mining
Mining rate determines profitability of a mine and when set at an optimal rate generates maximum NPV. Although mining rate depends on many parameters, ore tonnage has been used as the main determinant of mining rate in t...
Production and Optimisation of Biodieselfrom(Gossypium) Cotton Seed Oil by Two Stage Transesterification Process
Due to depletion of petroleum sources and recent increase in petroleum price and fluctuation in world market created interest on renewable energy sources. They are alternative to the conventional diesel, these fuel can b...