An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System

Abstract

This paper depicts how Project Information System was used to eliminate Non Value Added Time in a manufacturing plant. A current Process Cycle Efficiency was measured and data for constructing the present Process Cycle Efficiency was collected through production line visits, interviews of employees and observation of machine’s function at different production stages. Different causes of Non Value Added Time was determined. Regression analysis with the help of Minitab software were applied to evaluate most affected causes of Non Value Added Time. At present, Process Cycle Efficiency was found 63.47%. In order to improve Process Cycle Efficiency and to Reduce Non Value Added Time it was proposed to implement Project Information System, it was evaluated that future state Process Cycle Efficiency would be improved to 70.88% at initial stage.

Authors and Affiliations

Sagar S. Mehta, Prasad S. Puranik, Ankit V. Vaishnav

Keywords

Related Articles

Creating and Innovative Safety Culture Model for Construction Industries in Chennai

Construction Sector is very essential and an integral part of infrastructure development which gives tremendous boost to our country’s economy. The construction industry has registered enormous growth worldwide in recen...

Assessment of Heavy Metals Levels in Some Commonly Consumed Species of Prawns in Southwestern Nigeria

Three different kinds of prawns (Macrobrachium Felicium (MF), Macrobrachium macrobrachium (MM) and Demoscaris Trispinose (DT)) were collected from Ilaje (water side) area of Ondo State, Nigeria. The concentrations of he...

Design and Simulation of I2C protocol

Inter-Integrated circuit (I2C), is a bus protocol was proposed by Phillips semiconductor to enable faster device to communicate with slower devices without any data loss. The components of the I2C bus controller is cons...

A Review : Interference Mitigation In Mobile Body Sensor Networks

In recent time mobile body sensor network known as a capable technology having a number of applications in health and well-being. For low power sensor network, main problem in wireless body network is that it disturbs t...

LPG Gas Weight and Leakage Detection System Using GSM

In this paper, we proposed an LPG Gas Weight and Leakage Detection System Using GSM .This is useful in various applications in homes and hotels. Many times it happens that because of the rush or due to the shortage of c...

Download PDF file
  • EP ID EP23903
  • DOI http://doi.org/10.22214/ijraset.2017.4197
  • Views 214
  • Downloads 9

How To Cite

Sagar S. Mehta, Prasad S. Puranik, Ankit V. Vaishnav (2017). An Approach to Reduce Non-Value Added Time and Improve Process Cycle Efficiency by Implementing Project Information System. International Journal for Research in Applied Science and Engineering Technology (IJRASET), 5(4), -. https://europub.co.uk/articles/-A-23903