AN INTERACTIVE CONSTRUCTION PROJECT FOR METHOD OF STATEMENT BASED ON BIM TECHNOLOGIES FOR HIGH-SPEED MODULAR BUILDING

Journal Title: Architecture and Engineering - Year 2016, Vol 1, Issue 4

Abstract

The concept and methodology for interactive design of Methods of Statement based on the use of technical and informational models, technological charts, and 3D models of construction facilities is suggested. The article presents the peculiarities and principles for the speed-up assembling (erection, disassembling) of unified modular structures, pre-fabricated block sections, their transportation and rapidly erected modular buildings. The high speed of construction is reached due to the qualitative interactive Method of Statement, logistics of sequence and completeness of information, use of BIM technologies, unconditional use of permanent quality control of works execution at all construction stages with the automatic control of accuracy as to positioning of construction structures and execution of construction and technological operations.

Authors and Affiliations

Sergei Sychev, Gennady Badin

Keywords

Related Articles

Substantiation of the Replacement Interval of Construction Machines by the Target Reliability Level

The article presents results of researches in the field of ensuring operational capability of complex technical objects using the example of construction machines. Methods of determining the replacement interval of eleme...

ASSESSMENT OF SEISMIC INPUT ENERGY BY MEANS OF NEW DEFINITION AND THE APPLICATION TO EARTHQUAKE RESISTANT DESIGN

A methodology for assessing the seismic input energy into structure (building) from earthquake (or seismic) excitation is proposed. The procedure is based on the energy balance of the structure and employs the earthquake...

Dismantling and Reconstitution of Prasat Suor Prat, Angkor Thom, Cambodia

This paper presents geotechnical aspects of dismantling process of one of masonry towers named Prasat Suor Prat that had been constructed in the end of the 12th century during the Angkor Period in Cambodia. A series of 1...

THE MATHEMATICAL MODEL OF DOME COVERING INDUSTRIAL FACILITY

A statically determinate flat truss models the industrial facility's arch. To derive dependence of structural deflection on the number of panels in a span, the Maxwell–Mohr equation, computer mathematics system Maple and...

ESTIMATION OF TRANSPORTATION ENERGY EFFICIENCY BY BARTINI CRITERION L6T-4

The review of performance and energy effectiveness of transportations reveals the lack of the squared delivery speed in their structure. The need to attract the squared speed as the major factor in forming the assessment...

Download PDF file
  • EP ID EP355137
  • DOI 10.23968/2500-0055-2016-1-4-36-41
  • Views 62
  • Downloads 0

How To Cite

Sergei Sychev, Gennady Badin (2016). AN INTERACTIVE CONSTRUCTION PROJECT FOR METHOD OF STATEMENT BASED ON BIM TECHNOLOGIES FOR HIGH-SPEED MODULAR BUILDING. Architecture and Engineering, 1(4), 36-41. https://europub.co.uk/articles/-A-355137