Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)
Journal Title: Jurnal Sistem dan Manajemen Industri - Year 2017, Vol 1, Issue 1
Abstract
CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Village. This project has been late for 19 days from the dead line 126 days. Therefore the cost is getting higher. It’s happened because bad management is the problem source. Restoring the project time need to be focused on the cost and the due date based on the schedule. Scheduling evaluation using Critical Path Method (CPM) and Crashing to find optimal results using Critical Path Method (CPM) can be found the critical paths activity, there are ground digging , bopflang installation, stone installation, agregrate B agrgregation , aggregate A flatting, rigit bavement work, and refining, when the time suppression obtained optimal time results from 126 days to 92 days. It taken an alternative to the addition of working hours with duration 92 day after the crashing. Using two alternatives, additional working hours and the addition of workforce, obtaining the difference of extra hours of work cost Rp 80.128.125 and labourcost increase Rp 55.260 from the regular cost.
Authors and Affiliations
Ahmad Nalhadi, Nana Suntana
Analisis Sistem Antrian Pelayanan Registrasi Mahasiswa di BAAK Universitas Tridinanti Palembang
Administrative Bureau of Academic and Student Affairs (BAAK) Tridinanti University of Palembang (UTP) is an institution that serves the academic administration and UTP student affairs. The approval of the KRS (Card Study...
Analisis Pengendalian Kualitas Super Absorbent Polymer Dengan Menggunakan Metode Six Sigma
Quality control is an effort to increase customer satisfaction and minimize damage. Super Absorbent Polymer which is a product as a raw material for making baby diapers / elderly and sanitary napkins. In Super Absorbent...
IBM PENGELOLAAN DATA KEPENDUDUKAN KELURAHAN KROBOKAN SEMARANG
Population data management of Kelurahan Krobokan Semarang Semarang is still done manually. Manual management is vulnerable to problems. The data stored in document form has the potential for data loss, and damage. In add...
Optimalisasi Proses Produksi Celana Panjang Melalui Pendekatan Six Sigma
PT. Tainan Enterprises Indonesia branch of Cianjur produce various kinds of garment products. One of the most widely product is trousers. The product are still many defects. This is showed from the number of defective pr...
Analisa Infrastruktur Desa Sukaci-Baros Dengan Metode Critical Path Method (CPM)
CV. ABP a construction company worked in infrastructure building development for private and goverment. Now CV. ABP is handling infrastructure development project of the acropolitan area (Right Payment) Sukaci - Baros Vi...