ANALISIS MANAJEMEN “WAKTU” PADA USAHA PENANGKAPAN IKAN TUNA/CAKALANG DENGAN SISTEM RUMPON DI KAWASAN TIMUR PERAIRAN INDONESIA

Journal Title: Jurnal Ilmiah Binaniaga - Year 2005, Vol 1, Issue 1

Abstract

Planning from each activity specially in arrest of fish through of rumpon system always related problem of time allocation and requirement, expense and energy, when operate for arrest started, when have to arrive at schema to take gudgeon and when should have arrived at rumpon to fishing of fish how big expense which must be released, how big labour in concerned in it and others. This study specificly try to see and analyse requirement of required time in the effort arrest of tuna's/cakalang fish by using appliance catch Pool & Line. Which event perceived by activity of arrest since preparation up to moment landing of fish. Note requirement of time from each event represent empirical data to be analysed. Research in territorial of Banda Sea. Result of analysis indicate that from every activity of arrest most time allocation to every activity basically represent critical duration which require to be strived be achieved as precise as possible. Considering arrest of tuna's / cakalang fish by using rumpon mount its efficacy very determined by accuracy of moment time, hence effort to depress time variance in each event will ever strived.

Authors and Affiliations

Bambang Winarso

Keywords

Related Articles

PENETAPAN KEBIJAKAN PERIKLANAN ATAS DASAR PERILAKU KONSUMEN (Studi Kasus : Produk Shampoo)

There are three things that should be into consideration in advertising certain product, ic,; the extent of similar products advertised at the same target market and media, cost of advertising, and difficulty in measurin...

IMBALAN DAN GAYA KEPEMIMPINAN PENGARUHNYA TERHADAP KEPUASAN KERJA KARYAWAN DI BALAI BESAR INDUSTRI HASIL PERTANIAN BOGOR

The study was carried out to find out whether there were influence and correlation between : a) Reward received by the IRDABI’s employees on their job satisfaction. b) style of the leadership on the job satisfaction. c)...

ANALISIS MANAJEMEN “WAKTU” PADA USAHA PENANGKAPAN IKAN TUNA/CAKALANG DENGAN SISTEM RUMPON DI KAWASAN TIMUR PERAIRAN INDONESIA

Planning from each activity specially in arrest of fish through of rumpon system always related problem of time allocation and requirement, expense and energy, when operate for arrest started, when have to arrive at sch...

STUDI PENGEMBANGAN SDM MELALUI KAJIAN TENTANG PENGARUH DISIPLIN DAN LINGKUNGAN BELAJAR TERHADAP PRESTASI SISWA Studi Kasus SMU Bina Bangsa Sejahtera, Bogor

The study is aimed at finding out the influence of students’ learning discipline and learning environment, either physical or non-physical to the learning achievement. The research had been done since they were in the fi...

Download PDF file
  • EP ID EP547973
  • DOI 10.33062/jib.v1i01.147
  • Views 22
  • Downloads 0

How To Cite

Bambang Winarso (2005). ANALISIS MANAJEMEN “WAKTU” PADA USAHA PENANGKAPAN IKAN TUNA/CAKALANG DENGAN SISTEM RUMPON DI KAWASAN TIMUR PERAIRAN INDONESIA. Jurnal Ilmiah Binaniaga, 1(1), 27-38. https://europub.co.uk/articles/-A-547973