Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari

Journal Title: Sultra Civil Engineering Journal - Year 2021, Vol 2, Issue 1

Abstract

Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increased productivity will reduce work time, and will reduce costs, especially labor costs so that the minimum labor cost is obtained (labor costs) to get competitive prices both for auction and implementation. The purpose of this study is to analyze the labor productivity time in completing 1 m2 of masonry bricks and to analyze the productivity value of brick masons in completing work activities in the construction project of the Mandala Wangi 2 female dormitory. The results showed that the time required to complete 1 m2 of brick laying work was 41.13 minutes on average. The productivity of the artisans working on the 1st floor is an average of 1.45 m2/hr. Meanwhile, the productivity of craftsmen working on the 2nd floor is an average of 1.47 m2/hr.

Authors and Affiliations

Al Mustahyun, Sunaryo Sunaryo, La Ode Musa Rahmat, Sufrianto Sufrianto

Keywords

Related Articles

Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course Studi Kasus: Ruas Jalan Tugu munajah Kabupaten Bombana

The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...

Efektifitas Waktu Pelaksanaan Pekerjaan Rekonstruksi Jalan Wolo –Batas Kota Kolaka – Rate Rate

By analyzing the implementation of this project work is expected to know the comparison between the plan and the realization, the effectiveness of the time executor and factors affecting the effectiveness of implementati...

Rekayasa Bahan Pada Pekerjaan Pengaman Pantai

Material Engineering is used to find alternatives or ideas that aim to produce better / lower costs than the previously planned price with functional limitations and quality of work. The purpose of this research is to an...

Korelasi Nilai CBR Dengan kepadatan Lapangan Subbase Course

The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...

Hubungan Kondisi Fasilitas Pedestrian Terhadap Aspek Keselamatan Pejalan Kaki Di Depan Lippo Plaza Kota Kendari

This study aims to determine the characteristics of pedestrians, the existing conditions of pedestrian facilities, aspects of pedestrian safety, and the relationship of conditions of pedestrian facilities to aspects of p...

Download PDF file
  • EP ID EP710748
  • DOI 10.54297/sciej.v2i1.166
  • Views 44
  • Downloads 0

How To Cite

Al Mustahyun, Sunaryo Sunaryo, La Ode Musa Rahmat, Sufrianto Sufrianto (2021). Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari. Sultra Civil Engineering Journal, 2(1), -. https://europub.co.uk/articles/-A-710748