Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda

Abstract

The construction project will achieve success if the parties were able complete the construction project accordance schedule, safety, cost and quality, heve been established. Many cases delays construction building in Samarinda city, making those a new problem that must be handled and may result in many programs dormant. With thoso conditions, this research to identify and analyze the factors of delay construction building where these are the first step to success support of development projects. This research uses descriptive survey method. The purpose of this research, which describe a number of variables relating to the issue and studied the phenomenon. In this research the techniques to collect research data by questionnaire as an instrument to answer a set of questions or a written statement to the respondent. The goal this research is to obtain a complete description and depth. Case study data obtained from the primary data (questionnaire) and secondary data. Based on the research results, obtained F count > F table, it means the material factors, labor, equipment, finance, environment, government policy changes, contracts, scheduling and control, with simultan and partially technic are positiv influenced and significan to delays in construction building Dinas Cipta Karya dan Tata Kota Bina Marga in Samarinda. Based on the results of multiple regression obtained standardized koefisien β the material factors is 0.456, its mean that factors influence dominan to delay building projects Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda.

Authors and Affiliations

Norfirdaus . , Lalu Mulyadi, Tiong Iskandar

Keywords

Related Articles

Design and Analysis of an Excavator Bucket

An excavator is a run of the mill water driven substantial obligation human-worked machine utilized as a part of general adaptable development operations, for example, burrowing, ground leveling, conveying loads, dumping...

SPS Gold Code Generation and Implementation for IRNSS User Receiver

The Indian Regional Navigational Satellite System (IRNSS) with Indian Constellation is an autonomous regional satellite navigation system developed by Indian Space Research Organization (ISRO). In this paper we have impl...

Computer Aided Kinematic Synthesis Anddynamic Analysis Of Robot End Gripper Mechanism

In this paper, the new type of Impactive gripper is presented as end effector of robotic gripper. The systematic approach for design of such type robotic gripper is discuss that includes kinematic Synthesis, Static Analy...

A Survey on Soil Monitoring and Testing In Smart Farming Using IoT And Cloud Platform

The perception of Smart Agriculture is flattering a truth as it evolves from intangible models for the development of crop at different stages. In traditional agriculture, cultivation of the plants will be used to sustai...

Hazy Image Enhancement Using Cross Bilateral Filter

Haze is an atmospheric property where mist, dust, fog and smoke plays a major role in concealing the contrast of the images. Hazy images thus formed cannot provide a clear understanding of the image that has to be used f...

Download PDF file
  • EP ID EP392485
  • DOI 10.9790/9622-0709095357.
  • Views 111
  • Downloads 0

How To Cite

Norfirdaus . , Lalu Mulyadi, Tiong Iskandar (2017). Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda. International Journal of engineering Research and Applications, 7(9), 53-57. https://europub.co.uk/articles/-A-392485