Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda

Abstract

The construction project will achieve success if the parties were able complete the construction project accordance schedule, safety, cost and quality, heve been established. Many cases delays construction building in Samarinda city, making those a new problem that must be handled and may result in many programs dormant. With thoso conditions, this research to identify and analyze the factors of delay construction building where these are the first step to success support of development projects. This research uses descriptive survey method. The purpose of this research, which describe a number of variables relating to the issue and studied the phenomenon. In this research the techniques to collect research data by questionnaire as an instrument to answer a set of questions or a written statement to the respondent. The goal this research is to obtain a complete description and depth. Case study data obtained from the primary data (questionnaire) and secondary data. Based on the research results, obtained F count > F table, it means the material factors, labor, equipment, finance, environment, government policy changes, contracts, scheduling and control, with simultan and partially technic are positiv influenced and significan to delays in construction building Dinas Cipta Karya dan Tata Kota Bina Marga in Samarinda. Based on the results of multiple regression obtained standardized koefisien β the material factors is 0.456, its mean that factors influence dominan to delay building projects Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda.

Authors and Affiliations

Norfirdaus . , Lalu Mulyadi, Tiong Iskandar

Keywords

Related Articles

Finite Element Analysis of Locomotive Primary Suspension by Using Composite Materials

Springs Are The Elastic Components Which Are Used To Absorb The Shocks And Vibrations During The Dynamic Motion Of The Locomotive. These Springs Helps To Stabilize The Motion Of The Train On The Track By Reducing Vibrati...

Analysis of Coefficient of Performance & Heat Transfer Coefficient on Sterling Cycle Refrigeration system.

Concerns about the environmental impact of refrigerants used in vapour-compression refrigerators, have prompted the Stirling-Cycle Research to investigate the feasibility of low-cost Stirling-cycle machines that use air...

Sustainable Supply Chain System Model in Small and Medium Enterprise Furniture with Interpretive Structural Modeling (ISM) Approach

SMEs furniture Pasuruan Indonesia is a business actor who processes wood from forest products into goods that can add value to wood production. This SMEs furniture is also one of the superior products of Pasuruan Regency...

Link Conflict in Multistage Interconnection Networks

Multistage interconnection networks (MINs) are high performance indispensable networks with low cost for broadband switching technology and multiprocessor systems. Crosstalk is a critical issue in MINs. The undesired cou...

Design Multiplier-less CIC Filter with Compensators Providing Minimum Passband Attenuation

Multirate filters find application in communication, speech processing, image compression, antenna systems, analog voice privacy systems and in the digital audio industry. The cascaded integrator-comb filter is a digital...

Download PDF file
  • EP ID EP392485
  • DOI 10.9790/9622-0709095357.
  • Views 117
  • Downloads 0

How To Cite

Norfirdaus . , Lalu Mulyadi, Tiong Iskandar (2017). Analysis Factor of Delays Construction Building of Dinas Cipta Karya Tata Kota and Bina Marga in Samarinda. International Journal of engineering Research and Applications, 7(9), 53-57. https://europub.co.uk/articles/-A-392485