Analysis of DC Fast Circuit Breaker Opening and Arc Extinction in Urban Rail Transit Traction Power Supply System

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7

Abstract

Objective Arc extinction technology for DC (direct current) is one of the design challenges in urban rail transit traction power supply systems. Therefore, it is necessary to analyze the principles of DC opening and arc extinction for main DC fast circuit breakers. Method The principles of DC current interruption and arc extinction are introduced. The stable burning point and extinction conditions of DC current are discussed. Parameters for DC arc interruption are analyzed with an introduction to the arc extinction design principles of DC fast circuit breakers. Causes for the easy burning damage of DC fast circuit breakers in metro power supply systems are examined. Result & Conclusion To interrupt a DC arc, higher arc voltage than the power supply voltage is required, because increasing the arc voltage can extinguish the DC arc. The opening process of DC fast circuit breakers needs to consider both the arc burning time and system overvoltage factors. During the design and development of DC circuit breakers, attention should be paid to non-stable arc voltage and arc voltage for small current interruptions. During arc extinction, setting an additional RC (resistor-capacitor circuit) blowout coil during arc extinction, with the design of metal grids in the arc extinction chamber, can stabilize the arc voltage.

Authors and Affiliations

Junfeng MENG, Genshui HU, Zhiqi GUO, Xingjian HE

Keywords

Related Articles

Design and Verification of Safety Monitoring Device for Emergency Braking of Beijing Subway Capital Airport Line Vehicles

[Objective] To reduce friction brake wear and ensure emergency braking performance under electric braking, a safety monitoring device based on a two-stage emergency braking control is installed on Beijing Subway Airport...

Design and Realization of Urban Rail Transit AFC Intelligent Operation and Maintenance System Architecture Driven by Dual-core of Data and Model

Objective The traditional urban rail transit AFC (automatic fare collection) system suffers from maintenance problems such as slow speed, outdated method, unreasonable plan and high cost. It is necessary to adopt digital...

Integration Research on Next Generation Comprehensive Monitoring System for Urban Underground Infrastructure Operation

Objective The development of urban underground space in China is showing a trend towards diversification, depth, and complexity, making it challenging to diagnose and decision-making on causative factors through multi-di...

Research on Construction Error Simulation of Rigid Catenary for 160 km/h Urban Rail Transit

Objective As construction error of the rigid catenary at 160km /h train speed affects the dynamic performance of the pantograph catenary, the technical parameters that meet the condition for the pantograph and rigid cate...

Research on Degraded Operation Scheme of Train Autonomous Control System Based on Vehicle-to-vehicle Communication

Objective As a new generation of train control system, the TACS (train autonomous control system)based on vehicle-to-vehicle communication is significantly different from CBTC (communication-based train control) in sys...

Download PDF file
  • EP ID EP742642
  • DOI 10.16037/j.1007-869x.2024.07.058
  • Views 21
  • Downloads 0

How To Cite

Junfeng MENG, Genshui HU, Zhiqi GUO, Xingjian HE (2024). Analysis of DC Fast Circuit Breaker Opening and Arc Extinction in Urban Rail Transit Traction Power Supply System. Urban Mass Transit, 27(7), -. https://europub.co.uk/articles/-A-742642