Analysis of DC Fast Circuit Breaker Opening and Arc Extinction in Urban Rail Transit Traction Power Supply System

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7

Abstract

Objective Arc extinction technology for DC (direct current) is one of the design challenges in urban rail transit traction power supply systems. Therefore, it is necessary to analyze the principles of DC opening and arc extinction for main DC fast circuit breakers. Method The principles of DC current interruption and arc extinction are introduced. The stable burning point and extinction conditions of DC current are discussed. Parameters for DC arc interruption are analyzed with an introduction to the arc extinction design principles of DC fast circuit breakers. Causes for the easy burning damage of DC fast circuit breakers in metro power supply systems are examined. Result & Conclusion To interrupt a DC arc, higher arc voltage than the power supply voltage is required, because increasing the arc voltage can extinguish the DC arc. The opening process of DC fast circuit breakers needs to consider both the arc burning time and system overvoltage factors. During the design and development of DC circuit breakers, attention should be paid to non-stable arc voltage and arc voltage for small current interruptions. During arc extinction, setting an additional RC (resistor-capacitor circuit) blowout coil during arc extinction, with the design of metal grids in the arc extinction chamber, can stabilize the arc voltage.

Authors and Affiliations

Junfeng MENG, Genshui HU, Zhiqi GUO, Xingjian HE

Keywords

Related Articles

Earth Pressure Calculation Method for Deep Foundation Pit Excavation in Chengdu Pebble Stratum Area

Objective The existing theoretical calculation method of earth pressure does not take into account the discrete characteristics of pebble stratum such as large porosity and loose structure, and the calculated results are...

Cause Analysis of Seepage Disaster in Deep Foundation Pit of Metro Station in Karst Stratum

Objective In-depth study should be made on the seepage stability during deep foundation pit excavation in water-rich karst stratum in consideration of the water inrush disaster at the side wall or bottom of the pit durin...

Application of Impulse Response Characteristics in Rail-ground Transition Resistance Measurement

Objective The stray current harm in urban rail transit lines is increasingly non-ignorable. Stray current is not easy to be detected, and the amount of the rail-ground transition resistance is a crucial factor affecting...

Construction Optimization of Shallow Railway Tunnels under Unsymmetrical Pressure for Reducing Blasting Over-excavation

Objective Over-excavation in tunnel construction, mainly caused by inappropriate blasting,will affect the smooth progress and safety of tunnel excavation, increase construction cost and reduce economic benefits. In order...

Stability Study of Confined Aquifer Foundation Pit Bottom Plate Inrush Based on Nonlinear Failure Criterion

[Objective] In water-rich rock stratum regions, preventing confined aquifer inrush accidents is a key focus and challenge in the design and construction of deep foundation pit projects. Accurately and effectively determi...

Download PDF file
  • EP ID EP742642
  • DOI 10.16037/j.1007-869x.2024.07.058
  • Views 33
  • Downloads 0

How To Cite

Junfeng MENG, Genshui HU, Zhiqi GUO, Xingjian HE (2024). Analysis of DC Fast Circuit Breaker Opening and Arc Extinction in Urban Rail Transit Traction Power Supply System. Urban Mass Transit, 27(7), -. https://europub.co.uk/articles/-A-742642