Analysis of Delay by Alternative Passing Opportunities on Two Lane Highways

Journal Title: International Journal of Engineering and Science Invention - Year 2017, Vol 6, Issue 12

Abstract

As of December 31, 2016, the total number of national highways in Korea is 13,948 km (about 12.9% of all roads), of which about 6,000 km (42.9% of the national highways) are two lane roads. Since 2000, many two lane roads have been extended as part of the interregional mobility policy, resulting in high standard and over-investment controversy for extended four-lane roads. Since then, the government has been asking for reasonable engineering grounds (e.g. demand base) for construction of new roads or already designed roads. In this situation, it is necessary to envision efficient operation improvement technique through low budget input rather than unconditionally expanding roadway by 4th lane. Therefore, in this study, we tried to provide the grounds for applying to the domestic market by referring to the various operating methods (overtaking opportunities) applied abroad in order to increase the capacity of two lane roads in Korea and to operate them safely and efficiently. The results of the field survey and the simulation of two lane roads were analyzed for the sections where the 100% overtaking prohibition section, the 100% overtaking section (1km), and the overtaking lane were installed. As a result, the two lane road with the overtaking lane has an effect of about 8.7% in terms of the traffic volume of 1,000 cars compared with the traffic lane, and the service level is also improved. This can be used as a reference for providing overtaking opportunities on two lane roads, and it is possible to elicit the overtaking period or the length of the overtaking interval through the detailed analysis of the overtaking rate.

Authors and Affiliations

Young Rok Kim, Chun Joo Yoon

Keywords

Related Articles

Compressive Strength and Thickening Time of Cement in Oil Well

Proper slurry design is critical to the success of a cementing job. The best method to obtain a good slurry design with desired compressive strength is by laboratory experiments which involve experimenting different form...

An Optimized CPU Scheduling Algorithm

CPU Scheduling is the basis of multi programmed operating systems .CPU scheduling is one of the most crucial operations performed by operating system. Different algorithms are available for CPU scheduling. Among those al...

Confidentiality in Blockchain

Blockchain technology is one of the frequently discussed technologies in the recent years. It is changing the life style and way of thinking of the people. Due to its nature of free from control of central unit it has im...

Research on Effect of Cashew Kernel Traveling In Color Sorting Machine

Cashew Is An Agricultural Product That Plays An Essential Role In The Developments Of The Economy Of Viet Nam, Since Foreign Revenue From Cashew Products Is Ranked As One Of The Top Agricultural Exporting Commodities. By...

Different Deterioration Rates Two Warehouse Production Inventory Model with Time and Price Dependent Demand under Inflation and Permissible Delay in Payment

A two warehouse production inventory model with different deterioration rates under inflation and permissible delay in payments is developed. Demand is considered as function of price and time. Holding cost is considered...

Download PDF file
  • EP ID EP404220
  • DOI -
  • Views 76
  • Downloads 0

How To Cite

Young Rok Kim, Chun Joo Yoon (2017). Analysis of Delay by Alternative Passing Opportunities on Two Lane Highways. International Journal of Engineering and Science Invention, 6(12), 28-33. https://europub.co.uk/articles/-A-404220