Analysis of Difficulties and Technical Countermeasures in Construction of Road and Bridge Tunnels

Journal Title: Smart Construction Research - Year 2018, Vol 2, Issue 3

Abstract

With the development of the times, people's economic level is improving, the urban construction is accelerated, the road, bridge and tunnel construction as the focus of the urban construction scale of construction projects and the construction quantity is also growing. Subsequently, people pay special attention to their quality problems. At the same time, there are many difficulties and technical problems waiting to be solved in the construction process. These difficulties and technical problems are the important factors influencing the quality of tunnel construction. Only strictly and comprehensively control it so that the roads, bridges and tunnels can be well and rapidly developed. Next, the paper will make a comprehensive analysis of the difficulties and technical countermeasures in the construction of road bridge tunnel.

Authors and Affiliations

Chengsen Wang, Kun Qu, Yizhe Ren, Lina Liu, Wei Wang

Keywords

Related Articles

Analysis of Application of Environmental Engineering Construction in Ecological City

At present, with the continuous deterioration of the ecological environment and the gradual deepening of human understanding of the relationship between man and nature, the construction of an ecological city has become t...

Discussion on cost control experience in construction project management

With the current social and economic development, people have a new understanding of the development of the construction industry, from the quality of building to the cost of building work to management, it can be said t...

Vigorously develop PMC business, speed up the transformation of the design institute

This paper discusses the feasibility and advantages of PMC business in the design institute and puts forward that the design institute wants to realize the transformation and upgrading successfully and promote the realiz...

Ultimate Load Capacity of Optimal Designed Angelina ™ Beams

This study briefly summarizes the results of experimental tests performed on optimal designed Angelina™ steel beams. The objective of the investigation was to study the effect of hole geometry on the mode of failure and...

Research on technical points of installation and construction of mechanical and electrical engineering

With the rapid development of China's overall economy, the construction engineering industry is gradually improving. Architectural engineering is an important environment for people to live, and its quality and safety ar...

Download PDF file
  • EP ID EP678970
  • DOI -
  • Views 122
  • Downloads 0

How To Cite

Chengsen Wang, Kun Qu, Yizhe Ren, Lina Liu, Wei Wang (2018). Analysis of Difficulties and Technical Countermeasures in Construction of Road and Bridge Tunnels. Smart Construction Research, 2(3), -. https://europub.co.uk/articles/-A-678970