Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses

Journal Title: Journal of Sustainable Engineering: Proceedings Series - Year 2019, Vol 1, Issue 2

Abstract

The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is not optimal. It was alleged that due to the planning and maintenance of the management machinery was not good, so that the frequency of damage to the machine was still high, which gave the effect that the production was not achieved. For this reason, the effectiveness of the use of Fanuc line1 is done by using the Overall Equipment Effectiveness (OEE) method with the Six big losses calculation approach so that the level of efficiency can be known. The results showed that the magnitude of the OEE value on Fanuc line1 machines in April – August 2018 amounted to 78.82%, this value is still below the JIPM standard of 85%. The amount of Losses is influenced by reduced speed loss of 57.47% and breakdown loss of 22.79%.

Authors and Affiliations

Sukanta , Burhan N. , Setiawan , Dessy Agustina Sari

Keywords

Related Articles

Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses

The company produces several automotive components in Karawang. For the production process using Fanuc machines on Line1, but the results of evaluating the performance of the engine Fanuc Line1 engine effectiveness is no...

Ship-to-Shore Wireless Communication for Asynchronous Data Delivery to the Remote Islands

Nowadays, many people who live in remote islands of Indonesia are still facing difficulties in terms of access to information. In the locations where end-to-end communication is not available, the asynchronous approach c...

Hourly Rainfall Distribution Pattern in the Northern Coast of Bolaang Mongondow

The data for this research is compiled from the records of hourly rainfall between 1993 to 2014 which was generated from several. Automatic Rainfall Stations namely; Ayong-Bumbung Climatology Station, Sangkub-Huntuk clim...

Function Quality Improvement of Mahakam Riverbanks as a Public Open Space

The increasing numbers of people and buildings that continue to grow and tend to be uncontrolled in the settlement causing some negative impacts one of them is the consistency of land allotment. This has resulted in some...

Flood disaster mitigation concept of settlements in Sario watershed area

There are five large rivers which pass through and empties into Manado City, one of them is the Sario River. In 2014, the settlements around the Sario watershed area was severely damaged due to flash floods, in fact, the...

Download PDF file
  • EP ID EP639096
  • DOI 10.35793/joseps.v1i2.22
  • Views 62
  • Downloads 0

How To Cite

Sukanta, Burhan N. , Setiawan, Dessy Agustina Sari (2019). Analysis of Overall Equipment Effectiveness in Fanuc Line 1 Machines by Minimizing six big losses. Journal of Sustainable Engineering: Proceedings Series, 1(2), 164-173. https://europub.co.uk/articles/-A-639096