Abstract

The purpose of this study is to minimize pedestrian waiting time to cross the roundabout. This study employed an analytical hierarchy process for crossing points at the roundabout. AHP decision making of level 1-3 micro-alternatives and its ranking is represented in the hierarchical structure. The prime objective of producing a combination of solutions ultimately reduces wait time <6 secs, as long waiting time is a persisting issue. Combination of fractional solutions regarding fuzzy weights, represents reliability, efficiency, economy, traffic literacy, optimality, and waitingtime thinning. This result to maximize the user performance on the crossing site. Spiderweb represents commendable solutions obliged to the pedestrian crossing. Microscopic evaluation and time thinning factor also save budget, time and serves ease in crossing recommendations. Improved Pedestrian crossing and thinning wait time appear in higher fuzzy weights. There are different parameters and its combination, FHI is an uneconomical and efficient solution serves 99% pedestrian crossing. Before microscopic evaluation in user preference survey, the parameters combination, namely, CBAI and FHI recorded the highest and lowest performer respectively. After microscopic evaluation in terms of Fuzzy weights of properties, recorded that FHI and ADBI were highest and lowest performers respectively. The fractional solutions workable as per the pedestrian’s activities in terms of trip length at the roundabout, thus accuracy works up to the single pedestrian cross-ability and maximum to any number. The present research provides an all-inclusive approach to reduce the pedestrian waiting and crossing problems at the roundabout.

Authors and Affiliations

APEKSHA ADESH MENDHE, N. J. MISTRY AND RAKESH KUMAR

Keywords

Related Articles

BEHAVIOR & STABILITY ANALYSIS OF GEOGRID REINFORCED EARTHWALL: A CASE STUDY IN VIZIANAGARAM (A.P)

Reinforced Earth (RE) wall offers a variety of advantages when compared to conventional retaining walls and embankments for road approaches. This study is carried out on proposed RE wall design for an approach road on...

AUCTIONEERING IN THE PRACTICE OF ESTATE SURVEYORS AND VALUERS

There has been recent agitation amongst estate surveyors and valuers that auctioneering ought to be an aspect of their practice. This crave for supremacy appears contestable as they have not had an exclusive preserve i...

ALGORITHM OF FORMING KNOWLEDGEBASE FOR DECISION TAKING SUPPORT SYSTEMS IN CYBER SECURITY TASKS

In the article herein, we offer the total structure of modular decision taking support system in cyber security tasks. There is described the model for fuzzy inference subsystem. Being based on the fuzzy inference rule...

NUMERICAL INVESTIGATION OF FLOW PATTERN AND SCOUR CHARACTERISTICS AROUND ELECTRICAL TOWER FOUNDATIONS

The presence of some high voltage towers in flood stream is one of the most important problems that may lead to the collapse of these towers. The main reason for collapse is the soil erosion around the tower foundation...

EFFICIENCY OF SUPERPLASTICIZERS IN COMPOSITION OF SELF-COMPACTING CONCRETE MIXTURES

One of the main conditions for producing self-compacting concretes is the use of superplasticizers with a relatively high content of dispersed materials in the form of Portland cement, mineral additives, ground fillers...