Analysis of Rework and Rescheduling in Construction Project using SPSS Software

Abstract

Rework is a primary contributor to time wastage and time table overruns which eventually impact on cost, assets and quality. Rework is additionally affecting the mission performance. So minimizing the transform is important one. The goal of the questionnaire survey is to analyze the motives and have an impact on of rework. Questionnaire survey has been carried out among a variety of construction corporations and contractors in Salem District. The questionnaire prepared based totally on motives and influence of rework. Ranking analysis is completed by means of the use of the SPSS Statistical Package for the Social Sciences .In this analysis it helps to check the stability and consistency of information accumulated from the questionnaire survey. Finding the foremost reasons rescheduling will be done. P. Haritha | Dr. K. Vidhya "Analysis of Rework and Rescheduling in Construction Project using SPSS Software" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd30930.pdf

Authors and Affiliations

P. Haritha | Dr. K. Vidhya

Keywords

Related Articles

Library Automation An Overview

For several decades, concrete has been the most widely used construction material. Though conventional concrete CC performs very well under normal conditions, in special situations a very high compressive strength of con...

An AI Based ATM Intelligent Security System using Open CV and YOLO

Nowadays most of the surveillance cameras in ATM doesn’t record with detail for analysis of incidents. Due to this most of the ATM cases gets unsolved. In this paper a system to improve ATM security is proposed. The prop...

Applied Excel for Business and Marketing

Applied Excel is powerful to analyze business and marketing data. This paper intends to support business and marketing leaders the benefits of data forecasting with applied Excel. It showed the sale data forecasting for...

A Brief Overview on Active Air Sampling Procedure for Environment Monitoring

In this paper, we are going to discuss the ‘Active Air Sampling procedure for EM'. EM stands for Environment Monitoring. Environment monitoring is performed in the pharmaceutical manufacturing plants to monitor the con...

Effect of Accounting Information on Share Price of Quoted Banks in Nigeria

It is important for the investors to have a good understanding of the financial position of a company in other to make sound investment decisions. This study examined the relationship between accounting information and s...

Download PDF file
  • EP ID EP686339
  • DOI -
  • Views 117
  • Downloads 0

How To Cite

P. Haritha (2020). Analysis of Rework and Rescheduling in Construction Project using SPSS Software. International Journal of Trend in Scientific Research and Development, 4(4), -. https://europub.co.uk/articles/-A-686339