Analysis of Risk Components of Building Construction Projects in Construction Companies: Case Study of Projects in Jabodetabek

Journal Title: Journal of Economics, Finance and Management Studies - Year 2023, Vol 6, Issue 10

Abstract

Risk management is very important for a construction company to carry out all company activities and especially to run a construction project. As is known, the project is carried out through stages in which it is very loaded with unwanted events, ranging from the tender process to get the project, the design stage, the pre-construction stage, the construction stage, and the post-construction stage. It is determined that risk categories are divided into operational; Financial; legal; & marketing. Causative factors consist of external; legal; human; process; & system. Areas of cause determined: design &; marketing; legal; implementation; therapy. Risk treatment strategies are determined: eliminating sources of risk; maintaining risk with the right decision; changing the possibilities; and Changing consequences. Based on secondary data obtained on seven projects that have been completed in the Jabodetabek area by one of the construction companies in Indonesia, qualitatively it was found that operational risk occupies the top position, the category that most often arises unwanted events. Process factors are the highest factors as the cause of an unwanted event. Process factors are the highest factors as the cause of an unwanted event. Then the construction period is the highest area, and often an unwanted event occurs. Naturally, the construction period has the longest duration compared to other stages. It further eliminates sources of risk, transforms consequences and turns possibilities into the most frequent ones in the process of managing risks in the project. Meanwhile, based on the level of risk identified from 38 risks that occurred in seven projects, the level of extreme risk occurred in as many as 10 events and as many as 19 events, then after follow-up, the level of extreme risk became as many as 2 events and high to 19 events, this indicates that these unwanted events affect the profit target of the project being worked on. Thus, ERM becomes very important for a construction company in order to achieve the company's goals and objectives and ERM is an important part of good corporate governance

Authors and Affiliations

Suharno, Poerwaningsih S. Legowo

Keywords

Related Articles

Exchange Rate and its Forecasting: Market-Based Forecasting and Forecasting with the Use of Currency Betas (βS)

This paper is using the market-based and the currency beta (β) theories of exchange rate forecasting. It is testing empirically these theories by using data, spot and forward rates, from seven different countries with re...

Capacity to Serve in Training Activities of Higher Education Institutions, Experimental Assessment at the University of Labor and Social Affairs

Following the research approach and design, we clarified the stated objectives. The article evaluates the current situation and service capacity in training activities of higher education institutions. Presenting survey...

The Effect of Diversity of The Board of Commissioners on Bank Credit Risk in Indonesia

This study aims to determine: (1) the effect of board age diversity on bank credit risk, (2) the effect of board education diversity on bank credit risk, (3) the effect of board gender diversity on bank credit risk, and...

Improving Performance Based on Competency, Work Discipline and Leadership at the Bondowoso Regency Regional Revenue Agency

Every organization, whether government-owned or private-owned, is required to continue to improve its performance in line with increasing competition in all lines of business. This research is aimed at analyzing and dete...

The Effect of Product Quality, Service Quality, Environment Quality, and Product Assortment on Customer Loyalty trough Customer Satisfaction of BCA Mobile Application

The spread of the Covid-19 virus which is still increasing requires the Indonesian government to issue a policy to limit mobility for the sake of the nation's recovery. In the end, community activity in public places dec...

Download PDF file
  • EP ID EP727663
  • DOI 10.47191/jefms/v6-i10-44
  • Views 60
  • Downloads 0

How To Cite

Suharno, Poerwaningsih S. Legowo (2023). Analysis of Risk Components of Building Construction Projects in Construction Companies: Case Study of Projects in Jabodetabek. Journal of Economics, Finance and Management Studies, 6(10), -. https://europub.co.uk/articles/-A-727663