ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY

Journal Title: Proceedings on Engineering Sciences - Year 2020, Vol 2, Issue 4

Abstract

Overall Equipment Effectiveness (OEE) is a method of measuring the effectiveness of the use of equipment. This method is known as an application of a Total Productive Maintenance (TPM) program. The ability to clearly identify the source of problem and it causal factors is the main advantage of this method since the improvement effort becomes focused. Britannia Industries Pvt. Ltd. is one of the manufacturing companies that produce biscuits. Based on data from the Bourbon line production department, for the period of July- September 2019, the production process of bourbon biscuit often experienced constraints due to the high downtime and losses in the cookie capper machine. This resulted in the use of production process equipment that had not been optimal. It is important to find out the source of the problem and its causal factors before the company makes any improvement effort. This study aims to identify equipment losses and measure the achievement of OEE values in the cookie capper machine. The measurement result shows that the average of the effectiveness of cookie capper machine for the period July- September 2019 of was 69.47% and based on Japan Institute Of Plant Maintenance (JIPM) the value has not reached the standard that is > 85%, however, there is still possibility for improvement. The losses that give the most significant effect on the overall equipment effectiveness of the cookie capper machine is reduce speed that was equal to 26.23%. One way to minimize the losses is by maintaining the actual speed of operation and maintaining wear on each cookie capper machine.

Authors and Affiliations

S. Shreelakshmi, Anirban Chatterjee

Keywords

Related Articles

SYSTEMATIC INVENTIVE THINKING (SIT): A METHOD FOR INNOVATIVE PROBLEM SOLVING AND NEW PRODUCT DEVELOPMENT

In the era of globalization and rapid technological changes, companies are required to develop new products and services frequently in order to maintain their position in the competitive market. Globalization is bringing...

SELECTING LEAN SIX SIGMA MANAGER BY USING TYPE-2 FUZZY AHP WITH A REAL CASE APPLICATION IN A LOGISTICS FIRM

The aim of this study is to develop a framework for Selecting Lean Six Sigma Manager among candidates by using Type-2 Fuzzy Sets. Some authors found that the management of six sigma projects and management’s commitment a...

MODELING AND COMPARISON OF MAXIMUM LIKELIHOOD AND MEDIAN RANK REGRESSION METHODS WITH FRÉCHET DIST

In reliability analysis researchers, commonly model failure times with the lifetime distributions. In this article, we have considered the Fréchet distribution as a lifetime model. Often risk managers must make decisions...

A METHOD FOR SOLVING THE PROCUREMENT OPTIMIZATION PROBLEM BASED ON INVERSE CALCULATIONS

The paper describes a method for solving the procurement optimization problem based on inverse calculations. The method involves solving the unconstrained optimization problem and adjusting the obtained values of argumen...

NOVEL SOLUTION TO REYNOLDS EQUATION FOR EXTERNALLY PRESSURISED GAS BEARINGS AS A COMBINATION OF THE SOLUTIONS OF TWO INITIAL VALUE PROBLEMS

This paper presents a novel method which generates the solution of Reynolds boundary value differential equation as a combination of the solutions of two initial value problems (IVP). By using the linearized PH theory, t...

Download PDF file
  • EP ID EP690454
  • DOI 10.24874/PES0204.004
  • Views 138
  • Downloads 0

How To Cite

S. Shreelakshmi, Anirban Chatterjee (2020). ANALYSIS OF THE OVERALL EQUIPMENT EFFECTIVENESS TO MINIMIZE SIX BIG LOSSES OF COOKIE CAPPER MACHINE-A CASE STUDY IN MANUFACTURING INDUSTRY. Proceedings on Engineering Sciences, 2(4), -. https://europub.co.uk/articles/-A-690454