Analysis of the quality problems during production process of the stud frame of the stretching station

Journal Title: Production Engineering Archives - Year 2014, Vol 0, Issue 1

Abstract

The stud frame of stretching station WSH 400/15 was the main subject of the researches presented in this paper. The aim of the article was the quality analysis of the stud frame during its production process. Construction and scheme of production process of stud frame was presented. Analysis of main areas which generate incompatibilities of researched element was made. Proposals of process improvement with the help of relation diagram and affinity diagram were presented.

Authors and Affiliations

Manuela Ingaldi

Keywords

Related Articles

Agile Organization as a concept of production adjustment in the face of the crisis

The concept of an Agile Organization is the part of the management concepts which aim at adjustment of the production to ever changing environmet. In today’s fast changing landscape, agility may prove to be the differenc...

Interaction of steel cord – elastomer in radial tires for passenger vehicle

The article focuses on determination of selected material characteristics of samples from different areas of various old passenger tyre casings and on determination of mechanical properties of specific composites with el...

The application of value stream mapping method for identifying basic drawbacks and reducing duration of information process in a company

The article presents the method of mapping the value stream and the stages of the creation of value stream mapping to identify the fundamental flaws of the process flow of information and shortening the duration of the p...

The machines maintenance conditions assessment in the plastic industry

The purpose, methodology, main findings, the originality of the subject area (research), way of using. The main research analysis purpose is a presentation, an assessment and an interpretation of the research findings on...

Toyotarity. Term, model, range

The Toyotarity and BOST term was presented in the chapter. The BOST method allows to define relations between material resources and human resources and between human resources and human resources (TOYO-TARITY). This ter...

Download PDF file
  • EP ID EP165800
  • DOI -
  • Views 78
  • Downloads 0

How To Cite

Manuela Ingaldi (2014). Analysis of the quality problems during production process of the stud frame of the stretching station. Production Engineering Archives, 0(1), 2-5. https://europub.co.uk/articles/-A-165800