Application of Cost Control to Construction Projects

Journal Title: IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) - Year 2018, Vol 15, Issue 6

Abstract

A high rate project abandonment due to cost over-run has really defaced the most cities. Among the success parameters of construction project namely: cost, quality and time, the project cost was the most significant among the professionals in the construction industry. The sample size of 50 was used for the study. The field data were subjected to statistical analysis using the multiple regression analysis. Among the five independent variables only construction project quality control and the construction methods/techniques indicated significant statistical relationship to the cost control methods adopted for construction project. While the others project design control, socio-economic factors, laws and regulations governing construction projects showed insignificant relationship to the control of the cost of construction projects.

Authors and Affiliations

Opara Hyginus Emeka

Keywords

Related Articles

External Flow Analysis over Hyundai Model Using CFD

Computational fluid dynamic software ANSYS Fluent 15.0 is used to predict the physical parameters on the external surface of a vehicle. The simulation of the wind tunnel experiments using the above CFD package would be c...

Effect of Rice Husk Ash on the Compaction and Strength Properties of Shed Soil Treated With Carbide Lime and Sodium Hydroxide

The locally available shedi soil in Mangalore coast has been used in this investigation. The shedi soil which is also known as lithomargic soil is found to be problematic which is reported by many investigators due to it...

Design of Automobile Concrete Pump

This paper has been written with the following objective; “design an automobile concrete pump uses hydraulic power to transport the concrete with high efficiency and safely”. To reduce the accidents and increasing the co...

Productivity Improvement in Bus Body Manufacturing Using Value Stream Mapping and Line Balancing Technique

Bus body manufacturing play a key role in automotive manufacturing, as vehicle manufacturers often sub contract such enterprise to complete bus manufacturing process. In a fiercely competitive global environment, the bus...

Fixed Offshore Platform Rehabilitation with Friction Damper

This work presents a study for a fixed offshore platform to show the value of applying friction damper in increasing the lateral resistance under wind, waves and currents. It is considered an extendable work for previous...

Download PDF file
  • EP ID EP438856
  • DOI 10.9790/1684-1506010108.
  • Views 75
  • Downloads 0

How To Cite

Opara Hyginus Emeka (2018). Application of Cost Control to Construction Projects. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 15(6), 1-8. https://europub.co.uk/articles/-A-438856