Application of CPM and PERT On Construction of Rail Tracks

Abstract

As a foundation for project planning, execution, and supervision, management may use the Project Evaluation and Review Technique (PERT) and the Critical Route Method (CPM) to discover the longest time-consuming, or consuming, path across a network of tasks or activities. The solutions assist managers in maximizing the shortest time period feasible in order to save project costs and time in half. The use of project planning on the construction of railway lines is shown in this study article, which uses two project management methodologies. To demonstrate the logical sequence of actions to be undertaken in this research paper in order to fulfill this article's purpose, I used the Project Evaluation and Review Technique (PERT) and the Critical Path Method (CPM). The benefits of utilizing CPM scheduling to build railway tracks are discussed in this work. According to the results, the construction may be completed in 852 days rather than the 900 days initially projected, saving roughly 6%. This will show up the network diagram together with beginning and completion timings with the list of activities related with the target in an effective method so as to accomplish the building on or before a defined time limit with required quality standard.

Authors and Affiliations

Swapnila R. Nigam, Aarti Sharma

Keywords

Related Articles

Measuring Maintainability of Object Oriented Design: A Revisit

Maintainability has always been an elusive concept. Software maintainability is an external software quality attributes that estimate the complexity and effort required for maintaining software. The key concern of this r...

Modelling of Annual Extreme Rainfall, Temperature and Wind Speed Using OSA of EV1 and EV2 Distributions

Prediction of rainfall, temperature and wind speed is of utmost importance for planning, design and management of the civil structures at the project site. This can be carried out by fitting of probability distributions...

A Review on Smart Helmetvvv

Over speeding, intoxicated driving, and reckless driving are the leading causes of mortality among two-wheeler drivers. If emergency medical services had received accident information and been on the site in time, many l...

Influence of Data Mining and Data Warehouse on Strategic Planning: A Review Paper

Users can access their data in today's reporting environment, but it does not address all of their issues. The people have access to the statistics, but they cannot ensure the data's truthfulness or the speed with which...

Application of IoT in Healthcare

There has been a lot of research into medical facilities and technological developments during the last ten years. To be more specific, the Internet (IoT) has shown promise in connecting a range of healthcare gear, monit...

Download PDF file
  • EP ID EP746719
  • DOI 10.55524/ijircst.2022.10.2.105
  • Views 119
  • Downloads 0

How To Cite

Swapnila R. Nigam, Aarti Sharma (2022). Application of CPM and PERT On Construction of Rail Tracks. International Journal of Innovative Research in Computer Science and Technology, 10(2), -. https://europub.co.uk/articles/-A-746719