Applying experts methods in the selection procedures of foresight development programs

Journal Title: Logistics and Transport - Year 2011, Vol 12, Issue 1

Abstract

Foresight method is gaining support around the world as a powerful tool that creates common views on future development strategies. It is characterized by a unique feature, which is the maximum participation of stakeholders and experts. The paper presents examples of the results of research carried out based upon the expert methods of foresight procedures. Special attention was paid to different methods of identification and involvement of experts in implementing the projects. The methodology of foresight projects was brought closer, with particular emphasis on those methods which are based on expert knowledge - such as the Delphi technique, panel discussion, brainstorming, STEEP and SWOT analysis methods, public consultation and the scenarios formulation. The result of foresight exploration based on knowledge of experts is the formation of a wide vision of the future development of economy and technology, which helps to make decisions on an effective, long-term strategy of the government, enterprises and scientific institutions. Key words: experts knowledge, foresight.

Authors and Affiliations

Sylwester Markusik, Maria Cieśla, Damian Gąska, Stanisław Krawiec, Marek Flekiewicz, Ryszard Janecki

Keywords

Related Articles

Outsourcing as a Decision Having a Strategic Dimension that Influences the Creation of Competitive Advantage of Companies

Outsourcing is the conception of enterprise management, which involves using external resources and thus in the transfer to outside business partner implementation of specific processes in the enterprise. It is a concept...

Lateral Earth Pressure in Non-Cohesive Soils, Reinforced with Geotextiles in the Light of Laboratory Research

The subject of the paper is the non-cohesive medium layer with geotextiles reinforced as foundation in communication building engineering. The influence of horizontal bidirectional reinforcement on the change of value of...

The Identification of Selected Imperfections of Electric Traction Motors

Electric traction motors of rail vehicles operate in very harsh conditions. This is due to their varying load and power fluctuations, as well as their exposure to high humidity, excessive shocks, dust and changing ambien...

Analysis of the Possibilities of Using VI Corridor of Transport for the Alternative Export of Bulk Cargo from Upper Silesia (Poland) to the Mediterranean Countries

The article assesses the possibility of activation of transport and logistics services in relation Silesia – Trieste - Alexandria and by continuation towards India. The increasing demand for transport on this route, wher...

Environmental changes and new dimension of security

This paper presents an environment as life conditions and as a source of risks and crisis. Contemporary changes in environment from point of view possible influence on security situation, on health threat, life and life...

Download PDF file
  • EP ID EP166739
  • DOI -
  • Views 60
  • Downloads 0

How To Cite

Sylwester Markusik, Maria Cieśla, Damian Gąska, Stanisław Krawiec, Marek Flekiewicz, Ryszard Janecki (2011). Applying experts methods in the selection procedures of foresight development programs. Logistics and Transport, 12(1), 75-82. https://europub.co.uk/articles/-A-166739