APPRAISAL OF PROJECT CLOSEOUT

Journal Title: International Journal of Civil Engineering - Year 2018, Vol 7, Issue 3

Abstract

It’s important for companies to evaluate their project and it’s supposed to improve the performance, quality, to provide data needed for any future projects and to help the company developing the quality and the performance in order to meet and satisfy customer expectations by learning lessons from previous problems and to evaluate the decisions that were made in the past.

Authors and Affiliations

Abdalla, Ahmed Abdelrahman

Keywords

Related Articles

EVALUATION OF ENERGY CONSUMPTION RATIOS IN BUILDINGS

The quantity of heat energy to be evacuated in a room in order to reach the optimal thermal comfort depends enormously on the type of construction, in particular of its global volume coefficient of thermal inputs G (whic...

STUDY OF MECHANICAL PROPERTIES OF CONCRETE USING SYNTHETIC AND STEEL FIBER

Fiber reinforce concrete is a family of composite materials that combine the high compressive strength properties of cement mortars with significantly increased impact, flexural and tensile strengths imparted by the fibe...

ANALYTICAL MODEL FOR INCORRECT COST ESTIMATION IN LOCAL GOVERNMENTS IN JAPAN

Bid cancellation procedures owing to incorrect cost estimation corresponding to design have been occurring in many local governments. Incorrect cost estimation has a great influence on public services. In addition, incor...

INFLUENCE OF ALKALINE ACTIVATORS AND TEMPERATURE ON STRENGTH PROPERTIES OF GGBS BASED GEOPOLYMER CONCRETE

Since last few years, Concrete Technologists are putting in continuous efforts to minimize the consumption of Portland cement in concrete. Cement concrete offering architectural freedom is second highest consumed materia...

SEISMIC RESPONSE OF TALL BUILDING WITH UNDERGROUND STOREY USING DAMPERS

As the seismic load acting on a structure is a function of the self-weight of the structure, these structures are made comparatively light and flexible, which have relatively low natural damping. Results make the structu...

Download PDF file
  • EP ID EP301142
  • DOI -
  • Views 99
  • Downloads 0

How To Cite

Abdalla, Ahmed Abdelrahman (2018). APPRAISAL OF PROJECT CLOSEOUT. International Journal of Civil Engineering, 7(3), 21-30. https://europub.co.uk/articles/-A-301142