APPRAISAL OF PROJECT CLOSEOUT

Journal Title: International Journal of Civil Engineering - Year 2018, Vol 7, Issue 3

Abstract

It’s important for companies to evaluate their project and it’s supposed to improve the performance, quality, to provide data needed for any future projects and to help the company developing the quality and the performance in order to meet and satisfy customer expectations by learning lessons from previous problems and to evaluate the decisions that were made in the past.

Authors and Affiliations

Abdalla, Ahmed Abdelrahman

Keywords

Related Articles

nnovative Design Strategy Incorporating Temperature Effect on the Pennsylvanian Pavements

The objective of this research is to develop an innovative design strategy capable of handling the temperature variations in the asphalt concrete layers. This strategy handles weak soils specific to Pennsylvania using a...

ANALYTICAL MODEL FOR INCORRECT COST ESTIMATION IN LOCAL GOVERNMENTS IN JAPAN

Bid cancellation procedures owing to incorrect cost estimation corresponding to design have been occurring in many local governments. Incorrect cost estimation has a great influence on public services. In addition, incor...

EVALUATION ON SOCIO-ECONOMIC FACTORS OF CONSTRUCTION INDUSTRY IN DEVELOPING COUNTRIES

This report evaluates all the factors of construction industry, known as socio-economic factors in developing countries. The drastic influences of such factors are grouped together, and structured a questionnaire. This q...

SYNTHESIS OF SEASIDE HOUSE CONSIDERING AFFORDABLE LIMIT A CASE STUDY ON BANSHKHALI UPAZILA, CHITTAGONG, BANGLADESH

Bangladesh is bounded on the south by the Bay of Bengal. The coastline of Bangladesh is about 710 km long and the continental shelf extends over an area of about 24,800 sq. miles. of which about 37000km sq. is within 50m...

BEHAVIOUR OF FLYASH BRICK MASONRY COLUMNS

In this experimental work, relate the individual brick strength to that of the masonry strength. In this study flyash bricks have been considered, considering its common use in masonry work. 15 nos. of Flyash bricks of s...

Download PDF file
  • EP ID EP301142
  • DOI -
  • Views 86
  • Downloads 0

How To Cite

Abdalla, Ahmed Abdelrahman (2018). APPRAISAL OF PROJECT CLOSEOUT. International Journal of Civil Engineering, 7(3), 21-30. https://europub.co.uk/articles/-A-301142