ارائه مدل برنامه‌ريزي خطي فازي جهت ارتقاء بهره‌وري انرژي الکتريکي در تأسيسات تأمين آب شرب (مطالعه موردي: طرح آبرساني سيستان)

Journal Title: آب و فاضلاب - Year 2018, Vol 29, Issue 1

Abstract

A Fuzzy Linear Programming Model for Improving Productivity of Electrical Energy in Potable Water Supply Facilities (Case study: Sistan Water Supply Project) One of the most important operational issues in urban drinking water production and distribution systems is to assign a plan for running hours of water pumps. The cost of consuming electricity in these pumps allocates most of water and wastewater companies operational costs to itself which is dependent to their running hours. In this paper, meanwhile having a field study in rural water and wastewater company of Sistan, the constraints for specifying electric pumps operational time in water supplying resources such as restrictions in fulfilling demand, supply potable water with suitable quality and uselessness of electric pumps have been identified. Due to uncertainty and fuzziness of the constraints, a linear programming model with fuzzy constraints for determining electric pumps running hours per day is submitted with the objective to minimize electricity consumption and cost. After collecting and using required data for model, it proved that using the proposed model could reduce the costs of electrical energy and increase productivity up to 23 percent per month. The proposed mathematical fuzzy programming is able to specify electric pumps scheduling plan for water supply with the aim to reduce the costs of consuming energy. .

Authors and Affiliations

Vahid Baradaran, Abdolvesal Chari

Keywords

Related Articles

سنتز جاذب C14/Fe3O4@SiO2 و بررسي کارايي آن در حذف اورانيم از محلول‌هاي آبي و پساب واقعي با استفاده از ماده واسطه بنزاميد

Synthesis of C14/Fe3O4@SiO2 and Its Performance in Removing Uranium (VI) from Aqueous Solutions and Real Wastewater Using Benzamide Abstract Uranium separation and removal are important from environmental, public healt...

بهينه‌سازي فرايند تصفيه پساب کارخانجات لبني با استفاده از لخته‌کننده‌هاي طبيعي و شيميايي

Optimization of COD Removal from Dairy Plant Effluents Using Natural and Chemical Coagulants Effluents from dairy plants inactivate the active water ecosystem as a result of reducing their dissolved oxygen content, there...

بهينه‌سازي عملکرد هيدروسيکلون با هدف حذف ماسه از آب چاه (مطالعه موردي: چاه‌هاي آب شرب شهر مشهد)

Optimization of Hydrocyclone Performance in Sand Removal from Well Water (A Case Study of Drinking Water Wells in Mashhad) Hydrocyclones are used for removing suspended solids such as silt and sand from water. In this s...

بررسی کارايی فرايند شناورسازی با هوای محلول در حذف آنيلين از محيط‌های آبی

Investigating the Efficiency of Dissolved Air Flotation Process for Aniline Removal from Aquatic Environments Abstract Aniline is an almost undegradable compound found in many industrial effluents. It was the objectiv...

Download PDF file
  • EP ID EP332979
  • DOI 10.22093/wwj.2017.7157.1504
  • Views 101
  • Downloads 0

How To Cite

Vahid Baradaran, Abdolvesal Chari (2018). ارائه مدل برنامه‌ريزي خطي فازي جهت ارتقاء بهره‌وري انرژي الکتريکي در تأسيسات تأمين آب شرب (مطالعه موردي: طرح آبرساني سيستان). آب و فاضلاب, 29(1), 27-36. https://europub.co.uk/articles/-A-332979