Architectural Design Proposal for Beijing Subway Line 19 Ping’anli Interchange Station
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective Given the large scale of urban rail transit interchange stations, numerous environmental constraints, and the significant difficulties in station architectural design, it is necessary to conduct a scientific and rational design for interchange stations. Method Using the architectural design proposal for Beijing Subway Line 19 Ping’anli Interchange Station as example, the design control conditions for the interchange station are analyzed from various aspects, including planning requirements, current conditions, heritage and environmental protection needs, resource conservation demands, and other controlling factors. Solution ideas for challenging issues regarding station location, station type, scale, and other controlling factors in the architectural design proposal for the interchange station are studied. The final layout plan for Ping’anli Interchange Station is proposed, along with a summary of the design principle and key design points. Result & Conclusion The final layout plan for Ping’anli Interchange Station is as follows: Line 19 Ping’anli Station is located north of the intersection of Zhaodengyu Road and Ping’anli West Street. The main structure adopts a double-level island platform with a two-storey, double-column, and three-span structure. The first underground level serves as the concourse, and the second underground level is the platform. An ancillary building on the southeast side of the station has three underground floors, with an interchange passage on the second underground level connecting Line 19 and Line 6. The station has three entrances, two emergency exists, one accessible elevator, two ventilation shafts, and one cooling tower.
Authors and Affiliations
Nan GAO, Xia LIU, Zhenkai LIU
Optimization of Metro Tunnel Maintenance Strategy Based on Improved Particle Swarm Algorithm
[Objective] Maintenance strategy is the key factor influencing the lifetime service performance and maintenance cost of metro tunnel. Therefore, it is essential to develop more suitable optimization algorithms for mainte...
Simulation Analysis of A Metro Station Construction in Shenzhen with Small TBM Advancing Excavation Followed by Large TBM Enlargement
[Objective] The new technique of small-diameter TBM (tunnel boring machine) advancing excavations followed by large-diameter TBM enlargement is used for the first time in the construction of Tumor Hospital Station on She...
Door Howling Cause Analysis and Countermeasures of Urban Rail Transit Train Passing through Tunnels
Objective When the urban rail transit train with designed speed of 120 km/h passes through a tunnel at high speed, rear door howling problem of the tail car often occurs, seriously affecting passenger ride comfort. Thus...
Research on the Impact of Metro Station Illuminance on Passengers′ Emotion and Visual Cognition
Objective Proper illuminance environment plays an important role in improving the service level of metro stations, ensuring the safety of passenger evacuation and promoting the sustainable development of public transport...
Analysis of Cracking Causes at Grounding Terminals of Bogie Axle-end and Resolution Measures
[Objective] Due to continuous changes in the operating conditions of metro lines, abnormal vibrations between wheel and rail s occasionally occur, leading to fractures in the suspension components at the bogie axle-end a...