ASCE HONOR FOR THE TCZEW BRIDGE IN POLAND

Journal Title: Civil and Environmental Engineering Reports - Year 2009, Vol 1, Issue 3

Abstract

This note presents the background for the introduction of the quoted bridge, as the International Civil Engineering Landmark, on the list of the ASCE History and Heritage Program. The history and the key structural features of that bridge have been briefly discussed. The opinion has been expressed that this long-span lattice-tube girder bridge could be regarded, really, as an ingenious child of the famous tubular Britannia Bridge in England. The observation of a matching, open-minded and global historic landmark policy of the ASCE has been positively underlined.

Authors and Affiliations

Zbigniew CYWIŃSKI

Keywords

Related Articles

THE INFLUENCE OF TECHNICAL INFRASTRUCTURE ON THE ROUNDABOUT AREAS DEVELOPMENT

The article presents the analysis of roundabouts design aspects including the location of underground and overground infrastructure. Authors also undertake an attempt to assess the existing situation with planning condit...

LABORATORY RESEARCH OF TOE RESISTANCE BASED ON STATIC PILE LOAD TESTS IN DIFFERENT SCHEMES

Transfer of axial force from the head of a pile to the surrounding soil by skin friction and toe resistance is still uncertain. The results of the static pile load test are usually presented as settlement curve. This cur...

APPLICATION OF THE MATHAR METHOD TO IDENTIFY INTERNAL STRESS VARIATION IN STEEL AS A WELDING PROCESS RESULT

The paper deals with the method to identify internal stresses in two-dimensional steel members. Steel members were investigated in the delivery stage and after assembly, by means of electric-arc welding. In order to perf...

Seed germination of selected plants under the influence of heavy metals

In the paper has been presented the influence of selected heavy metals salts solutions: CuSO4, Pb(NO3)2, ZnCl2 and Cd(NO3)2 on the germination of seeds of the higher plants. The solutions with the various concentrations...

IMPACT OF COMMUNICATION BARRIERS ON URBAN DEVELOPMENT OF NOWOGRÓD BOBRZAŃSKI

Network communication links is an indispensable element of development shaping. Any change in the way of using area should be preceded by an analysis of future impact taking into account the transport capacity. The devel...

Download PDF file
  • EP ID EP270299
  • DOI -
  • Views 70
  • Downloads 0

How To Cite

Zbigniew CYWIŃSKI (2009). ASCE HONOR FOR THE TCZEW BRIDGE IN POLAND. Civil and Environmental Engineering Reports, 1(3), 15-22. https://europub.co.uk/articles/-A-270299