Assessment of Contractors Project Management Maturity

Abstract

In effect, concrete is broadly used as a development fabric due to the fact of its high strength cost ratio in many applications. Concrete constructions are usually expected to provide bother free service all through its intended design life. However, these expectations are now not realized in many constructions because of structural deficiency, fabric deterioration, unanticipated over loadings or physical damage and accordingly civil structures like buildings, dams, bridges and so forth are subjected to non stop deterioration over the years. This extent of injury or deterioration appreciably relies upon on the quality of materials and workmanship at every the building stage. The deterioration of structures can be a result of a number elements which include hearth damage, frost action, chemical attack, corrosion of steel and so on at some point of the lifestyles span of the structure. The investigation of soundness is therefore vital for discovering the existing serviceability of the structure and its scope for future developments or for the trade in its utilization. Such an investigation can be carried out using the following methods a Visual examination b Non Destructive Testing c Partial Destructive Testing. Besides, it turns into fundamental for structures hit by means of an earthquake, a bomb blast or any other calamity. In general, Soundness estimation to be finished for buildings which are crossed over 15 years of age. K. Ajithkumar | P. Deepan "Assessment of Contractors Project Management Maturity" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020, URL: https://www.ijtsrd.com/papers/ijtsrd30936.pdf

Authors and Affiliations

K. Ajithkumar | P. Deepan

Keywords

Related Articles

Emerging Trends in Financial Services Sector and its Implications

India has a diversified financial sector undergoing rapid expansion, both in terms of strong growth of existing financial services firms and new entities entering the market. As emerging markets demand more financial fle...

Linear Programming Problems with Icosikaipentagonal Fuzzy Number

The objective of this paper is to introduce a new fuzzy number with twenty five points called as Icosikaipentagonal fuzzy number. In which Fuzzy numbers develop a membership function where there are no limitations of any...

Study on Solid Waste Management System and Design of Sanitary Landfill for Monywa Township

The description of this paper is "Study on Solid Waste Management System and Design of Sanitary Landfill for Monywa Township". It has mainly contained two portions. First, analysis of solid waste composition and disposa...

A Universal Printed Antenna for UHF RFID Applications

In this paper, a printed rectangular monopole antenna is designed for RFID (Radio Frequency Identification) reader applications. The antenna is designed to operate at a frequency of 860 MHz to 960 MHz allocated for UHF R...

Digitalization in Education Sector

In today's world, digitalization has been a game changer in one of the most important sectors- Education. It has been effectively used as a prominent technique in the whole gamut of education sector. It has blurred the b...

Download PDF file
  • EP ID EP686350
  • DOI -
  • Views 82
  • Downloads 0

How To Cite

K. Ajithkumar (2020). Assessment of Contractors Project Management Maturity. International Journal of Trend in Scientific Research and Development, 4(4), -. https://europub.co.uk/articles/-A-686350