Asset Management Value Oriented Nanjing Metro Asset Information System Construction

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 1

Abstract

[Objective] In the process of URT (urban rail transit) asset formation, there are challenges in the smooth transmission of asset information, leading to issues such as ′inconsistency between accounts and reality,′ difficulties in equipment maintenance and replacement due to untraceable information during the operation-maintenance phase. To address these issues, it is essential to strengthen the management of asset information throughout the entire lifecycle and construct an asset information system for URT, thereby enhancing the asset management efficiency in URT enterprises. [Method] By reviewing existing research on asset management value, summarizing the value of URT asset management, and using this as a guide, the deficiencies in the existing URT asset information system are identified. Based on this analysis and utilizing axiomatization design theory, asset management value is integrated into the dynamic management process of the whole life cycle of assets. Demand research for asset information users is conducted, and the findings are incorporated into the top-level design of the information system. [Result & Conclusion] The value of URT asset management is reflected in reliability, functionality, effectiveness, and sustainability. Taking Nanjing Metro as the research object, a top-level information system for URT assets is constructed, consisting of an asset information classification system, a coding system and information templates.

Authors and Affiliations

Hao HONG, Shiwei SU, Jichuan GAO, Jie LI, Mingyue ZHOU

Keywords

Related Articles

Development of Automatic Calculation Program for Passenger Flow Assignment in Urban Rail Transit Network Based on VISUM

[Objective] In view of the much repetitive work in the calculation process of passenger flow assignment in urban rail transit network, an automatic calculation program is developed on the basis of the research on the pas...

Influence of Urban Rail Transit Carbody Vertical Vibration on Pantograph-catenary Current Collection Performance

Objective Most existing studies on catenary system dynamics simulation are based on the assumption that the pantograph base has only longitudinal degrees of freedom, neglecting the influence of carbody vertical vibration...

Calculation Model of Safety Distance between Shield Tunnels and Underground Cavities in Water-Rich Sandy Cobble Stratum

[Objective] In order to ensure the shield tunnel construction safety in water-rich sandy cobble stratum when passing through underground cavities, it is necessary to study the safe distance between the shield tunnels a...

Research Progress of Urban Rail Transit Traction Power Supply System with Bidirectional Converters

Objective Most of the traditional traction power supply systems of urban rail transit lines in China use diode rectifier units, which have the deficiencies that electric energy can only flow in one direction and the rege...

Research on Speed Tracking Control Algorithm for Urban Rail Transit Trains Based on Sliding Mode and RBF Neural Network

Objective Addressing the issues of low control accuracy and poor disturbance rejection in conventional ATO (automatic train operation) speed control algorithms in urban rail transit train operation control systems, a new...

Download PDF file
  • EP ID EP727729
  • DOI 10.16037/j.1007-869x.2024.01.046
  • Views 45
  • Downloads 0

How To Cite

Hao HONG, Shiwei SU, Jichuan GAO, Jie LI, Mingyue ZHOU (2024). Asset Management Value Oriented Nanjing Metro Asset Information System Construction. Urban Mass Transit, 27(1), -. https://europub.co.uk/articles/-A-727729