Bicriteria in n×2 Flow Shop Scheduling under Specified Rental Policy with Uncertain Processing Time

Journal Title: International Journal of Management, IT and Engineering - Year 2012, Vol 2, Issue 9

Abstract

This paper is an attempt to obtain an optimal solution for optimizing the bicriteria taken as minimization of the total rental cost of the machines taken on rent under a specified rental policy subject to obtain the minimum makespan for n-jobs, 2-machine flowshop scheduling problem. The processing time of jobs are uncertain in nature that is not known exactly and are in fuzzy environment. The fuzzy processing times are described by triangular fuzzy membership function. Further the concept of job blockage in processing of jobs is introduced. A numerical example is provided to demonstrate the computational efficiency of proposed algorithm.

Authors and Affiliations

Deepak Gupta, Sameer Sharma and Shefali Aggarwal

Keywords

Related Articles

slugChallenges and Opportunities of Technology Transfer Management

Today, technology has become so rich that many of the developing countries can , t even afford to have all the facilities, It is admitted that these changes and takeovers affected economical, industrial, security, tech...

slugEnhancement of Security for Initial Network Entry of SS In IEEE 802.16e

Security is the main concern in these days and everyone want to secure his communication. IEEE 802.16e is a new broadband technology that is used to provide secure wireless access to thousands of users in a city at hig...

slugThe current situation, future prospect of Poverty and inequality in Sudan

This research paper aims to address income poverty and inequality in Sudan. Poverty and inequality indicators were computed using both primary and secondary data sources. P-alpha equation, Povstat and Simsip models wer...

TRAFFIC STUDY ON ROAD NETWORK AND IDENTIFY TRANSPORT IMPROVEMENT PROJECTS REQUIRED IN SALEM

Salem is the fifth largest city with a population of 7.54 lakhs (2011) in Tamil Nadu. Fast growth in population and vehicles in these centre have caused congestion in roads for movement of passengers and goods affectin...

A study on Stress and Job Performance among School Teachers of Karimnagar City

This is an effort to check the performance, and also the self interest in work setting of school teachers within the karimnagar town. The teacher job is generally connected with psychological feature work and had to de...

Download PDF file
  • EP ID EP18549
  • DOI -
  • Views 274
  • Downloads 11

How To Cite

Deepak Gupta, Sameer Sharma and Shefali Aggarwal (2012). Bicriteria in n×2 Flow Shop Scheduling under Specified Rental Policy with Uncertain Processing Time. International Journal of Management, IT and Engineering, 2(9), -. https://europub.co.uk/articles/-A-18549