Budget Analysis of Direct Costs of the Project on the Basis of Earned Value Management

Journal Title: Бізнес Інформ - Year 2014, Vol 6, Issue 0

Abstract

Control mechanism based on budgeting is formed during the evolution of the enterprise is constantly changing and requires certain modifications and clarifications depending on the direction of a business or the main activity of an organization. Specificity of the main activity of a shipbuilding enterprise dictates the order of formation of the consolidated budget in the context of projects. Project budgets themselves are altered by increasing or decreasing the duration and scope of work in the initial stages and during their implementation, which complicates the analysis and control of project costs. The article analyzes the essence of the concept of earned value method, and proposes the use of this method for the analysis and control of the budget direct costs of shipbuilding enterprise. An example of the analysis of the direct costs of the project budget and calculations of the main indicators of earned value during project implementation in the context of the construction of a hull was given.

Authors and Affiliations

Artem Pichka

Keywords

Related Articles

About Information Space of a Modern Higher Educational Establishment

In this article the author describes a system of modern information and education space of higher educational school in the example of SB NUBiP "CATU".

Assessment of Risks and Threats to the Resources and Ukraine Environmental Security in the Region

The problem of providing resource and environmental safety, efficiency natural and economic potential of the area is one of the priorities for each region of Ukraine. Therefore, this article developed and scientifically...

Simulation of the Outsourcing Company's Activity

The article is aimed at considering possibilities for using the means of simulation modeling in the management of the companies' activities in the sphere of IT-outsourcing. During the synthesis of a number of specialists...

Theoretical basics of the essence of personnel potential at the economic branch level

The article highlights the author's vision of the essence of personnel potential that based on existing approaches to its treatment. The possibility of applying the term personnel potential at the economic branch level i...

Disclosure of Investment Property in the Financial Statements in Accordance with International Standards

The article is aimed at elaboration of a structured template for disclosure of investment property in the financial statements in accordance with international standards. Results of a study show that, in contrast to glob...

Download PDF file
  • EP ID EP100033
  • DOI -
  • Views 110
  • Downloads 0

How To Cite

Artem Pichka (2014). Budget Analysis of Direct Costs of the Project on the Basis of Earned Value Management. Бізнес Інформ, 6(0), 257-262. https://europub.co.uk/articles/-A-100033