Calculating the Groundwork Volume for the Construction of Logging Roads

Journal Title: Lesnoy Zhurnal (Russian Forestry Journal) - Year 2022, Vol 16, Issue 4

Abstract

Organizational and engineering models provide a formalized description of the construction process, including a list of operations, their sequence, description of the relationship between the operations, and the features of the work technology. Network models have the most complete mathematical description. However, a number of authors in their works point to serious shortcomings inherent in the network modeling of construction flow. The network model allows displaying accurately enough only the relationship of specialized traffic flows when the object is divided into sections equal in size to interchangeable grips. Such schedules are quite effective in planning and operational management of road works in a short planning period (decade or month). The adequacy of the real construction representation is violated when the network model is enlarged for long-term planning of the flow. The currently developed so-called generalized network models achieve process combination and continuity by introducing links between the operations, characterized by temporal parameters assuming any values, including negative values. However, the complexity of the mathematical description of these models still prevents their use in solving optimization problems. The research aims at developing a mathematical model and an algorithm for calculating the operational control of the groundwork volume during the construction of logging roads. A model of a complex object flow is proposed, where the flow operation time has a discrete nature. This condition is realized in the model by dividing the planned operation period of a complex flow into equal time intervals – scheduling intervals. The below described model of complex road construction flow can be presented on the basis of the scheduling task classification scheme and the analysis of existing economic and mathematical models and methods. The scheduling model developed for the purpose of determining the optimal groundwork for the road construction elements is a deterministic (at the 1st stage), discrete in time, engineering model with variable speeds of operations.

Authors and Affiliations

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii

Keywords

Related Articles

Differentiation of Dust Holding Capacity of Poplar Crowns

One of the key parameters of comfort and compliance with sanitary standards for cities is dustiness of atmosphere. Plantings of representatives of the poplar genus (Populus L.) become a reliable means of optimizing this...

Performance Measurement of Blueberry Leaves and Fruits

The genus Vaccinium includes cowberries, cranberries and blueberries. Nowadays they are under large scale cultivation for the purposes of fruit production. In the Republic of Belarus bog blueberry (Vaccinium uliginosum L...

Principal Directions for Prevention of Emergency Fire Situations in Forests

The study investigates the central current issues in extreme forest fire extinction from organizational and technological perspectives. An analysis of the problems in the field of forest pyrology is established on the pr...

Improving Chemical Maintenance Techniques in Forest Plantations

This article covers concerns about the elimination of low-value deciduous trees by chemical treatment in favour of conifers. Various methods for removing undesirable vegetation are discussed with an indication of their a...

The Condition of Woody Plants at the Sites of Protective Afforestation and Landscaping of the Kalachevsky District, Volgograd Region

The Kalachevsky district of the Volgograd region belongs to the regions that require stabilization of natural resources use. Land and forest reclamation and landscaping will ensure the resource potential of the district’...

Download PDF file
  • EP ID EP706819
  • DOI 10.37482/0536-1036-2022-4-156-172
  • Views 123
  • Downloads 0

How To Cite

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii (2022). Calculating the Groundwork Volume for the Construction of Logging Roads. Lesnoy Zhurnal (Russian Forestry Journal), 16(4), -. https://europub.co.uk/articles/-A-706819