Calculating the Groundwork Volume for the Construction of Logging Roads

Journal Title: Lesnoy Zhurnal (Russian Forestry Journal) - Year 2022, Vol 16, Issue 4

Abstract

Organizational and engineering models provide a formalized description of the construction process, including a list of operations, their sequence, description of the relationship between the operations, and the features of the work technology. Network models have the most complete mathematical description. However, a number of authors in their works point to serious shortcomings inherent in the network modeling of construction flow. The network model allows displaying accurately enough only the relationship of specialized traffic flows when the object is divided into sections equal in size to interchangeable grips. Such schedules are quite effective in planning and operational management of road works in a short planning period (decade or month). The adequacy of the real construction representation is violated when the network model is enlarged for long-term planning of the flow. The currently developed so-called generalized network models achieve process combination and continuity by introducing links between the operations, characterized by temporal parameters assuming any values, including negative values. However, the complexity of the mathematical description of these models still prevents their use in solving optimization problems. The research aims at developing a mathematical model and an algorithm for calculating the operational control of the groundwork volume during the construction of logging roads. A model of a complex object flow is proposed, where the flow operation time has a discrete nature. This condition is realized in the model by dividing the planned operation period of a complex flow into equal time intervals – scheduling intervals. The below described model of complex road construction flow can be presented on the basis of the scheduling task classification scheme and the analysis of existing economic and mathematical models and methods. The scheduling model developed for the purpose of determining the optimal groundwork for the road construction elements is a deterministic (at the 1st stage), discrete in time, engineering model with variable speeds of operations.

Authors and Affiliations

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii

Keywords

Related Articles

Force Analysis of a Single Grain Cutting Process in Wood Grinding Using Spherical Corundum

The productivity of the wood grinding process can be increased by using abrasive wheels with spherical corundum grains. They also expand the area of application of rigid abrasive instruments by reducing soiling and elimi...

Features of the Harvesting and Logging Equipment Market in Russia

Russian forest sector forms an attractive market for harvesting and logging equipment, however the position of Russian manufacturers is extremely weak. A brief overview of the current state of the market is presented wit...

Highly Productive Pine Forests in a Changing Climate

Forest steppe of the Central Chernozem Region (CCR) of Russia belongs to the zone of highly productive pine forests. In 2015, for the first time a partial destabilization of Scots pine (Pinus sylvestris L.) was recorded...

Organic Carbon Stocks in the Forest Soils of Northern Mongolia

Soil organic carbon (SOC) stock and its variation on the regional and large spatial scales are critical for estimating the global SOC inventory and predicting further changes. This study was aimed at estimation of the SO...

Formation of the Secondary Area of Caragana аrborescens Lam. in the Forest Parks of Yekaterinburg

The article is devoted to the analysis of the distribution and features of the ecological and biological confinement of Caragana arborescens Lam. in the forest parks of Yekaterinburg. Caragana plantations have been studi...

Download PDF file
  • EP ID EP706819
  • DOI 10.37482/0536-1036-2022-4-156-172
  • Views 98
  • Downloads 0

How To Cite

Maksim V. Matsnev, Natalia G. Ponomareva, Oleg N. Tveritnev, Petr V. Tikhomirov, Dmitry M. Levushkin, Andrei N. Briukhovetskii (2022). Calculating the Groundwork Volume for the Construction of Logging Roads. Lesnoy Zhurnal (Russian Forestry Journal), 16(4), -. https://europub.co.uk/articles/-A-706819