COMPARATIVE ANALYSIS OF BUILDING PRODUCTION FORECASTING USING REGRESSION, NEURAL NETWORKS AND ARIMA METHODS
Journal Title: Scientific Journal of the Military University of Land Forces - Year 2010, Vol 157, Issue 3
Abstract
The study analyzed the possibility of forecasting of Lower Silesia building production using regression, neural networks and ARIMA methods. For the forecasting regression method, daily weather data of Lower Silesia were used. Potential predictors were eliminated by checking the following: the normality of their distributions (Kolmogorov-Smirnov , Lilliefoes and Chi square tests), the condition of absence of correlation between variables (correlation coefficient) and the condition of equality of variance between the variables (Levene, Brown-Forsythe tests). To perform calculations with the neural networks method, MLP and RBF networks were used by entering all the weather data obtained. In the case of the ARIMA method, forecasting was carried out on the basis of statistical values from previous years. An analysis of errors was performed by calculating ME, MAE, MPE and MAPE errors. The direction of further research was proposed.
Authors and Affiliations
Magdalena ROGALSKA , Zdzisław HEJDUCKI
PROPOZYCJA NOWEGO POJEDYNCZEGO CYKLU TESTOWEGO SILNIKA SPALINOWEGO PODCZAS WYKONYWANIA STANOWISKOWYCH BADAŃ NIEZAWODNOŚCI
Przy ocenie niezawodności samochodowych silników spalinowych dokonywanej na stanowisku badawczym określa się następujące wskaźniki: średnią częstość uszkodzeń, średnią częstość wymiany części, średnią częstość regulacji,...
ROLE OF LOGISTICS IN WEAPON SYSTEMS LIFE CYCLE
The article presents the structure of weapon systems life cycle according to NATO standardization documents and the national system of the acquisition of weapon systems. On the basis of the conducted analysis the most im...
LIGHT CLAY AND STRAW BALE SOLUTIONS IN CONTEMPORARY HOUSING CONSTRUCTION
The article presents issues related to solutions with light clay and straw bales in the contemporary housing construction. Building using straw bales and light clay is simple, eco-friendly and accessible to all. It fits...
HARMONOGRAMOWANIE ROBÓT BUDOWLANYCH W SYSTEMIE POTOKOWYM Z NIEPEWNYMI DANYMI
W pracy rozpatrujemy problem harmonogramowania przedsięwzięć budowlanych realizowanych w systemie potokowym. Są to bardzo ważne zagadnienia praktyki budowlanej, mające znaczący i bezpośredni wpływ na ostateczne koszty re...
ASSIGNMENT, TASKS AND ORGANIZATIONAL STRUCTURES OF SIGNAL SUB-UNITS WITHIN COMMAND BATTALION AT FORMATION LEVEL
In the article “Assignment, Tasks and Organizational Structures of Signal Sub-units within Command Battalion at Formation Level” the author presents the organizational structures of signal sub-units. He also describes th...