Comparative Study for Software Project Management Approaches and Change Management in the Project Monitoring & Controlling

Abstract

A software project encounters many changes during the software development life cycle. The key challenge is to control these changes and manage their impact on the project plan, budget, and implementation schedules. A well-developed change control process should assist the project manager and the responsible team in monitoring these changes.In this paper, we examine a number of approaches for project monitoring & control with different scenarios of project schedules. The comparison shows the effect of applying each approach on the cost and the time of the project. The evaluation illustrates that the integrated software Project and Change Management (IPCM) is a more efficient for providing more control in tracking change requests, and improve the performance monitoring process.

Authors and Affiliations

Amira Gaber, Sherief Mazen, Ehab Hassanein

Keywords

Related Articles

 Transform Domain Fingerprint Identification Based on DTCWT

 The physiological biometric characteristics are better compared to behavioral biometric identification of human beings to identify a person. In this paper, we propose Transform Domain Fingerprint Identification Bas...

Automated Grading Systems for Programming Assignments: A Literature Review

Automated grading for programming assignments is becoming more and more important nowadays especially with the emergence of the Massive Open Online Courses. Many techniques and systems are being used nowadays for automat...

A Hybrid Steganography System based on LSB Matching and Replacement

This paper proposes a hybrid steganographic ap-proach using the least significant bit (LSB) technique for grayscale images. The proposed approach uses both LSB match-ing (LSB-M) and LSB replacement to hide the secret dat...

Model for Predicting Educational Domain Rate based on the Regional Level

The geographic information system (GIS) is rapidly becoming the part of current technology trends. GIS can be used to identify the factors that become the reason for an individual to adopt a field or subject. We used GIS...

How to Model a Likely Behavior of a Pedagogical Agent from a Real Situation

The aim of this work is to model the behavior verbal and nonverbal behavior of a Pedagogical Agent (PA) can be integrated into an Intelligent Tutoring System. The following research questions were posed: what is the nonv...

Download PDF file
  • EP ID EP133306
  • DOI 10.14569/IJACSA.2016.070236
  • Views 90
  • Downloads 0

How To Cite

Amira Gaber, Sherief Mazen, Ehab Hassanein (2016). Comparative Study for Software Project Management Approaches and Change Management in the Project Monitoring & Controlling. International Journal of Advanced Computer Science & Applications, 7(2), 259-264. https://europub.co.uk/articles/-A-133306