Abstract

[Objective] To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method] A comprehensive construction plan for shield receiving is introduced, incorporating techniques such as the double-ring freezing method, active dewatering, mining methods, and shield empty push construction. The temperature variation characteristics of freezing and key construction technologies are analyzed using on-site monitoring data. [Result & Conclusion] The comprehensive construction plan is proven to be safe and effective for dealing with shield receiving in water-rich silty sand stratum conditions. Adopting double-ring freezing method combined with active dewatering could effectively prevent issues related to water and sand inflows in mining method tunnels. During the steam thawing process of the inner ring freezing wall, the temperature of the outer ring freezing wall increases by approximately 5 ℃. When employing the shield empty push method through a mining method tunnel that is not fully thawed, the maximum shield thrust is 26 500 kN, which is less than the theoretical value of shield push resistance. At this point, the ground displacement and tunnel deformation all meet control requirements. During shield empty pushing, the temperature at the interface between shield casing and partially thawed inner ring soil remains around 3 ℃. When crossing the frozen zone using the mining method, different levels of land subsidence are observed near the tunnel, while the soil layer subsidence trend far away from the tunnel remains relatively stable.

Authors and Affiliations

Yubing CHEN, Zhihe LIU, Fangqi XIAO, Wei LIU, Nianwu LIU, Xiaolu GAN, Shenghan CHEN

Keywords

Related Articles

Application of Platform Screen Door Gap Detection Device on Fully Automatic Operation Metro Lines

Objective On the fully automatic operation metro lines, there exists a gap between the platform screen door and the train, leading to the risk of clamping people and objects. In order to ensure train operation safety, a...

Protective Measures for a Tunnel on Xi’an Metro Line 6 Crossing Ground Fissure Zone

Objective Xi’an Metro Line 6 Phase Ⅱ project encounters seven ground fissures along one of its tunnels, the poor engineering properties may cause partial tunnel collapse and uneven settlement at the base, exacerbating gr...

Optical Power Prediction Method Based on Double Pooling Multilayer Perception

Objective In response to the situation where historical optical power data in metro communication systems is missing despite the sufficient historical related data, an optical power prediction method based on double pool...

Research and Application of City (Suburban) Railway Post-station Fully Automatic Turn-back Method

Objective CTCS2+ATO (Chinese Train Control System Level 2 + Automatic Train Operation) system can meet the requirements for cross-line operation between city (suburban) railway and national mainline and intercity railway...

Utility Evaluation of Compartment Service Configuration Based on Kano Model

Objective Aiming at enhancing the comprehensive experience for passengers during travel, it is necessary to investigate and analyze compartment service demands, optimize compartment service facility configurations. Metho...

Download PDF file
  • EP ID EP752731
  • DOI 10.16037/j.1007-869x.2024.12.026
  • Views 6
  • Downloads 0

How To Cite

Yubing CHEN, Zhihe LIU, Fangqi XIAO, Wei LIU, Nianwu LIU, Xiaolu GAN, Shenghan CHEN (2024). Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum. Urban Mass Transit, 27(12), -. https://europub.co.uk/articles/-A-752731