Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 12
Abstract
[Objective] To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method] A comprehensive construction plan for shield receiving is introduced, incorporating techniques such as the double-ring freezing method, active dewatering, mining methods, and shield empty push construction. The temperature variation characteristics of freezing and key construction technologies are analyzed using on-site monitoring data. [Result & Conclusion] The comprehensive construction plan is proven to be safe and effective for dealing with shield receiving in water-rich silty sand stratum conditions. Adopting double-ring freezing method combined with active dewatering could effectively prevent issues related to water and sand inflows in mining method tunnels. During the steam thawing process of the inner ring freezing wall, the temperature of the outer ring freezing wall increases by approximately 5 ℃. When employing the shield empty push method through a mining method tunnel that is not fully thawed, the maximum shield thrust is 26 500 kN, which is less than the theoretical value of shield push resistance. At this point, the ground displacement and tunnel deformation all meet control requirements. During shield empty pushing, the temperature at the interface between shield casing and partially thawed inner ring soil remains around 3 ℃. When crossing the frozen zone using the mining method, different levels of land subsidence are observed near the tunnel, while the soil layer subsidence trend far away from the tunnel remains relatively stable.
Authors and Affiliations
Yubing CHEN, Zhihe LIU, Fangqi XIAO, Wei LIU, Nianwu LIU, Xiaolu GAN, Shenghan CHEN
Selection of Visual Rail Train Trajectory Following Points Based on Minimum Passing Width on Circular Curves
[Objective] The impact of selecting trajectory following points for a type of three-module visual rail train on vehicle road passing width is studied, providing theoretical basis for the choice of trajectory control poin...
Grid Continuous Positioning Technology for Urban Rail Transit CBTC Wireless Environment Monitoring System Based on Inertial Navigation
Objective The current secondary positioning system of urban rail transit train beacons has a positioning accuracy of 300 meters, failing to meet the high-precision positioning requirements of wireless environment monitor...
Prediction Model of Metro Traction Power Consumption Based on Grey Neural Network
Objective In order to improve train operational efficiency, it is necessary to monitor metro traction power consumption and establish a relevant energy consumption model for prediction analysis of metro traction power co...
Stability Analysis of Jinan Qixiuchang Metro Station during the Foundation Pit Temporary Supports Dismantling
Objective It is prone to lose stability, affecting the engineering safety in the process of dismantling the supports for metro station deep and large foundation pit. Therefore, it is necessary to analyze the stability in...
Stability Study of Shield Tunnel Excavation Face Induced by Shield Chamber Pressure Entering in Shallow-Buried Sand Stratum
[Objective] Solve the problem of excavation surface stability during shield tunneling with pressure entry in shallow-buried sandy stratum.To solve the problem of the stability of tunnel face of shield tunnel with press...