St. Mary's parish church in Chojna was erected at the turn of XIV and XVc. in a shape of three aisles, hall church without transept, completed from the west with a single tower and from the east with polygonal presbytery with an ambulatory attached. The convergence of characteristic structural and decorative features with employed ones in medieval churches being attributed to Hinrich Brunsberg's fabric resulted in such a way, that also authorship of St. Mary in Chojna was assigned to this legendary architect and master builder of late Middle Ages period. The church was destroyed by fire during WWII in February 1945 and since then had remained as an open ruin. In 1997 reconstruction procedure of the church was begun under the leadership of the author and it still continues. This text consists of the sum of experiences connected with confronting design ideas and solutions with their executions on the site during construction works.

Authors and Affiliations

Maciej PŁOTKOWIAK

Keywords

Related Articles

DESIGN AND CONSTRUCTION PROBLEMS CONNECTED WITH ENSURING EVEN THERMAL INSULATION OF SINGLE-LAYER WALLS

The design of single-layer walls appears to be extremely simple. In the opinion of many designers, the additional insulation of tie beams and balconies continues to solve all problems. However, tests on single-layer wall...

NUMERICAL AND EXPERIMENTAL ANALYSIS OF A SHEAR CONNECTION MADE USING A TOP-HAT PROFILE

The paper proposed a numerical model of a shear connection between a reinforced concrete slab and a steel shape. The connection was made using a top-hat profile. A method for conducting experimental research on shear con...

THE INFLUENCE OF ACCELERATION ON THE EFFICIENCY OF SAND COMPACTION TESTS CONDUCTED ON A VIBRATING TABLE

The paper presents a standard vibrating table for fresh concrete testing adopted for determination of maximum dry density (dmax) of sand. Vibration is an efficient method for coarse soil compaction therefore vibrating t...

CHANGES TO WATER QUALITY IN THE WATER SUPPLY NETWORK OF ZIELONA GÓRA

The article presents physiochemical parameter changes in water supply network of Zielona Góra. On the basis of the obtained test results, the impact of prolonged retention of water in the network on its quality was deter...

‘OLD-NEW’ MINING TOWNS - EXAMPLES OF THE RENOVATION AND ADAPTATION OF POST-INDUSTRIAL OBJECTS

Poland’s economic transformation has proved to be a critical phase in the contemporary development of its industrial cities, initiating profound spatial and functional changes. In researching the basics of the developmen...

Download PDF file
  • EP ID EP242355
  • DOI -
  • Views 62
  • Downloads 0

How To Cite

Maciej PŁOTKOWIAK (2015). CONCEPT AND ITS IMPLEMENTATION DURING THE RECONSTRUCTION OF THE CHURCH OF BLESSED VIRGIN MARY IN CHOJNA. Civil and Environmental Engineering Reports, 4(19), 87-98. https://europub.co.uk/articles/-A-242355