Congestion Management in Deregulated Electricity Market with Facts Devices using Firefly Algorithm
Journal Title: INTERNATIONAL JOURNAL OF ENGINEERING TRENDS AND TECHNOLOGY - Year 2014, Vol 10, Issue 9
Abstract
The job of an self-governing system operator in a aggressive market atmosphere would be to make easy the total send off of the power that gets constricted among the market. With the development of an growing quantity of bilateral contracts being assigned for bazaar trades, the opportunity of inadequate property primary to group congestion may be inevitable. Real-time congestion in transmission line can be defined as the working situation in which present is not sufficient transmission potential to apply all the traded communication concurrently due to a number of unpredicted contingencies. Firefly algorithms is assigned to locate best solutions of piercing non-linear uninterrupted mathematical designs. Firefly Algorithm is solitary of the current elapsing designs which is encouraged by fireflies actions in environment. A sequence of elapsing experiments by every algorithm were studied. The outcome of this testing were understand and compared to the optimal solutions set up consequently far-off on the origin of signify of completing moment to join to the most favorable. The Firefly algorithm seems to execute superior for advanced mode of noise.
Authors and Affiliations
P. Mutharasu , R. M. Sasiraja
Fire Accidents in Buildings – Case Studies
Fire accident in buildings is a threatening one now a day. These accidents create heavy lives and property losses. To find the reasons, frequency and giving protection to all type of buildings became challenges to the pr...
Controlling various network based ADoS Attacks in cloud computing environment: By Using Port Hopping Technique
Cloud computing security is sub-domain of computer security, network security, and information security. It refers to a broad set of security policies, technologies, and flow controls deployed to protect data, appl...
Optimum Size Selection For Spring Loaded Detachable Canister Launch Vehicle Interface For Multistage Long Range System
Canister-launch vehicle(LV) interface size is optimised using selective assembly method. Any over or under size of the interface is a mission critical. LV and canister are made of nos of sections and their respective pos...
Optimizing the Cost for Resource Subscription Policy in IaaS Cloud
Cloud computing allow the users to efficiently and dynamically provision computing resource to meet their IT needs. Cloud Provider offers two subscription plan to the customer namely reservation and on-demand. The reserv...
Improving Predictability by Blending VSM with KANBAN
Value flows in every process, and early days was of focusing on Value Addition at every such intermediate stage of process. However, with evolution of KANBAN, JIT under the umbrella of the Toyota Manufacturing System (TM...