CONSUMER PROTECTION MODEL IN THE PRACTICE OF SELLING AND PURCHASING APARTMENTS WITH PRE-PROJECT SELLING SYSTEM IN INDONESIA
Journal Title: International Journal of Civil Engineering and Technology - Year 2019, Vol 10, Issue 3
Abstract
The writing of this article aims to outline a legal protection model for consumers buying and selling apartments in Indonesia. Most of the sale and purchase of apartments is done with a pre-project selling system, namely sales before the building is completed. This practice is at high risk for consumers so the law must play a role in providing protection. This article is based on legal research (normative), namely research conducted by studying and analyzing legal materials and problems related to research. The results of the study show that consumers are the parties most often disadvantaged in buying and selling with a pre-project selling system. Consumers who buy apartments have to approve the making of an income agreement known as PPJB (Agreement on the Sale and Purchase). Whereas PPJB is an agreement document that has weaknesses because it does not provide protection to consumers who have weak training power. So that legal protection is needed for consumers by applying the principles of protection based on justice by involving the government directly in regulating and overseeing the sale and purchase of apartments with a preproject selling system.
Authors and Affiliations
DIAN CAHAYANI, ADI SULISTIYONO and M. HUDI ASRORI
FIBER-REINFORCED CONCRETE: POLYDISPERSE REINFORCEMENT
Currently, there is the large development of dispersion-reinforced concrete in the construction industry. This is due to the fact that with all the advantages of concrete and reinforced concrete, they also have several...
THE ROLE OF SMALL AND MEDIUM ENTERPRISES (SMES) IN IMPROVING THE LOCAL ECONOMIC GROWTH
Small and Medium Enterprises (SMEs) have a great contribution to the economic growth in Indonesia both macro and micro. Economic growth in west Sumatra exceeded the national economy in 2015 up to 5.46% while the nation...
ANALYSIS OF REDUCTION IN PEDESTRIAN WAITING TIME FOR CROSSING ROUNDABOUT
The purpose of this study is to minimize pedestrian waiting time to cross the roundabout. This study employed an analytical hierarchy process for crossing points at the roundabout. AHP decision making of level 1-3 micr...
EXPERIMENTAL INVESTIGATION FOR THE BEHAVIOR OF MULTI–LAYERED TARGET UNDER PROJECTILE IMPACT
This paper presents the ballistic performance of transparent polymer materials. The need to design transparent projectile protective armour leads to research on ballistic limit for the type of material. The ballistic r...
VEHICLES FLOW MANAGEMENT ALONG INNER RING ROAD IN CHENNAI CITY
25.2 km long inner ring road (IRR) or State highway 2 is a six lane road and it is a major transportation corridor encircling the city of Chennai. It is emerging as a major industrial conurbation having many industrial...