Contributing Factors of Time Overrun in Public Sector Construction Projects

Journal Title: Engineering, Technology & Applied Science Research - Year 2018, Vol 8, Issue 5

Abstract

Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.

Authors and Affiliations

M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, A. A. Panhwar

Keywords

Related Articles

Forecast on 2030 Vietnam Electricity Consumption

The first but very significant step in electricity system planning is to make an accurate long-term forecast on electricity consumption. This article aims to forecast the consumption for the Vietnam electricity system (G...

Effect of Time, Solvent-Solid Ratio, Ethanol Concentration and Temperature on Extraction Yield of Phenolic Compounds From Olive Leaves

This study aims to determine the factors affecting the process of extraction of phenolic compounds from olive leaves. Two methods of extraction were used in this work and different tests were implemented with the aim of...

A Study of the Effective Lifetime of Aluminum Buckets Used in Blood Bank Centrifuges

Rotating parts of blood bank centrifuges are under heavy mechanical cyclic stresses due to their centrifugal loading conditions. Estimating the effective lifetime for these parts is very important for their application....

A Cloud Associated Smart Grid Admin Dashboard

Intelligent smart grid system undertakes electricity demand in a sustainable, reliable, economical and environmentally friendly manner. As smart grid involves, it has the liability of meeting the changing consumer needs...

Risk Assessment in the Maritime Industry

Risk assessment is a well-developed field which many operators are currently applying to improve their operations and reduce their risk exposure. This paper is intended to provide an overview of the risk assessment for m...

Download PDF file
  • EP ID EP239282
  • DOI -
  • Views 268
  • Downloads 0

How To Cite

M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, A. A. Panhwar (2018). Contributing Factors of Time Overrun in Public Sector Construction Projects. Engineering, Technology & Applied Science Research, 8(5), -. https://europub.co.uk/articles/-A-239282