Contributing Factors of Time Overrun in Public Sector Construction Projects

Journal Title: Engineering, Technology & Applied Science Research - Year 2018, Vol 8, Issue 5

Abstract

Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.

Authors and Affiliations

M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, A. A. Panhwar

Keywords

Related Articles

A Novel Structure for Vector Control of Symmetrical Six-Phase Induction Machines with Three Current Sensors

Vector control is one of the most popular multiphase induction machine drive methods due to its dynamic performance. Since all phase currents are needed in vector control drive, by increasing phase numbers, the number of...

Developing Activities for Teaching Cloud Computing and Virtualization

Cloud computing and virtualization are new but indispensable components of computer engineering and information systems curricula for universities and higher education institutions. Learning about these topics is importa...

Assessing Market Development and Innovation Project Management Factors Using the PICEA-g Hybrid Evolutionary Multi-Criteria Decision Technique. The Calcimine Company Case Study

Project management includes the consideration of complex decision modes used in modern decision support techniques. The aim of this paper was to prioritize such factors and evaluate their effects on project management an...

Spot Welding of 6061 Aluminum Alloy by Friction Stir Spot Welding Process

This study was focused on the effect of welding parameters on the lap-shear fracture load of the welded joints prepared by friction stir spot welding. Four different weld parameters were analyzed: rotational speed, dwell...

Real Time Speed Control of a DC Motor Based on its Integer and Non-Integer Models Using PWM Signal

This paper exploits the advantage of non-integer order modeling of a process over integer order, in those cases where the process model is required for control purpose. The present case deals with speed control of a DC m...

Download PDF file
  • EP ID EP239282
  • DOI -
  • Views 275
  • Downloads 0

How To Cite

M. A. Akhund, H. U. Imad, N. A. Memon, F. Siddiqui, A. R. Khoso, A. A. Panhwar (2018). Contributing Factors of Time Overrun in Public Sector Construction Projects. Engineering, Technology & Applied Science Research, 8(5), -. https://europub.co.uk/articles/-A-239282