Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3

Abstract

[Objective] In the early operation stage of Jinan Metro Line 3, multiple sporadic high-speed circuit breaker closing failures are reported. To improve the reliability of train operation, it is necessary to optimize the high-speed circuit breaker control circuit in the traction system. [Method] According to the relevant closing command and the component status when a closure failure of the high-speed circuit breaker on Line 3 train occurs, and in accordance with the control logic principle of the high-speed breaker, the causes of the occasional closure failure are analyzed and the optimization measures are put forward. [Result & Conclusion] The causes of the occasional closure failure are that in the process of closure control of high-speed circuit breaker, the induced electromotive force generated at both ends of the high-speed circuit breaker coil makes the closing power insufficient, resulting in the failure closure of the breaker. The improvement measure is to connect freewheel diodes at both ends of the high-speed circuit coil to suppress the induced electromotive force generated by the above coil. With the above improvement measure, the closure failure of the high-speed circuit breaker caused by induced electromotive force never occurs again, and the reliability of train operation is effectively improved.

Authors and Affiliations

Xu ZHANG, Xianchao ZHAO, Yanna ZHAO

Keywords

Related Articles

Automatic Identification and Early-warning System for On-board Rail Corrugation Based on Image Processing Technology

[Objective] Current daily metro track inspections, including manual detection and track inspection vehicle method, suffer from issues such as low efficiency and high costs, failing to meet the increasing demands for rail...

Application Practice of Adjusting Rigid Catenary Sinusoidal Wave Stagger Value to Ameliorate Abnormal Pantograph-catenary Wear in Operating Line

Objective The early-designed rigid catenary system for urban rail transit lines in China adopts a sinusoidal wave arrangement method, leading to a prevalent abnormal wear of PC (pantograph-catenary) during operation. Und...

Comparative Analysis of Calculated and Experimental Current Carrying Capacities of Rail Transit Aluminum Alloy Conductive Rails

Objective AAC (luminum alloy conductive) rails are widely used in rail transit power supply systems. However, a significant deviation often exists between the calculated and tested values of the permissible current carry...

Influence of Vertical Ground Motion on Seismic Response of Subway Station Co-structure System

Objective The co-structure system of subway station (hereinafter referred to as 'co-structure system') realizes the connection and conversion between the box structure and the box frame structure through thick plates. Du...

Muck Improvement Experiment of Earth Pressure Balance Shield Tunnel in Water-rich Sand Layer Based on Pressure Transfer Characteristic

Objective Due to the characteristics of strong permeability and high water content in water-rich sand layer, the poor muck improvement can easily cause accidents such as spout spilling of screw conveyor and mud cake form...

Download PDF file
  • EP ID EP732820
  • DOI 10.16037/j.1007-869x.2024.03.046
  • Views 73
  • Downloads 0

How To Cite

Xu ZHANG, Xianchao ZHAO, Yanna ZHAO (2024). Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3. Urban Mass Transit, 27(3), -. https://europub.co.uk/articles/-A-732820