Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9
Abstract
Objective The metro lines connected by connection line may adopt different power supply current return modes. In order to improve the efficiency of train line transfer, it is necessary to set up the return mode conversion section within the connection line and design the return mode conversion scheme, which shall meet the demand of using the running rail and the return rail to return current. Method With Shaoxing Metro Line 1 (hereinafter referred to as "Line 1") and the first phase project of Shaoxing Metro Line 2 (hereinafter referred to as "Line 2") as examples, the overview of the two lines and details of the connection line are introduced. From the aspects of operation conditions, economy and engineering feasibility, three design schemes (Scheme 1, Scheme 2 and Scheme 3) for the power supply return mode conversion within the connection line are proposed, and their advantages and disadvantages are analyzed respectively. Result & Conclusion Scheme 3 is recommended. It can not only effectively solve the problem of train power loss, reduce the possibility of generating electrical conduction and foreign current between the two lines, but also optimize the train line transfer process and improve the efficiency.
Authors and Affiliations
Jianbo WANG, Qingyun CHEN, Lian WU
Optimization of Train Operation Organization during Metro Catenary Collapse
[Objective] In the event of a collapsed non-redundant rigid catenary, it is essential to adjust train operation organization according to different collapse scenarios, minimizing the impact of the incident and reducing p...
Smoke Exhaust Schemes for Metro Terminal Station Storage Tracks and Reserved Main Lines
[Objective] The smoke exhaust paths for metro terminal station storage tracks and reserved main lines are different from those for various auxiliary lines in middle stations, thus it is necessary to study suitable smoke...
Development of Automatic Calculation Program for Passenger Flow Assignment in Urban Rail Transit Network Based on VISUM
[Objective] In view of the much repetitive work in the calculation process of passenger flow assignment in urban rail transit network, an automatic calculation program is developed on the basis of the research on the pas...
Performance Analysis of Slurry After Sewage Infiltration in Pipe Jacking Construction of Subway Station Entrances and Exits Project
Objective During pipe jacking construction, aging sewage pipes within the construction area are prone to rupture, leading to sewage infiltration into the thixotropic slurry along the soil body, thus impacting the perform...
New Network Architecture for Urban Rail Transit Video Surveillance System Based on SDN and NFV Technologies
Objective The video surveillance system of Shanghai urban rail transit faces challenges such as insufficient flexibility, poor scalability, and complex operation and maintenance. In response, a new network architecture f...