Cost Escalation in Construction Projects
Journal Title: International Journal for Research in Applied Science and Engineering Technology (IJRASET) - Year 2017, Vol 5, Issue 1
Abstract
The Construction industry is an integral part of a country’s economy, its growth and plays a pivotal role in developing the country’s infrastructure. The current status report published by the Indian Ministry of Statistics and Programme Implementation (MOSPI) highlighted that out of the 951 projects being monitored 309 projects have cost overruns and 474 projects are behind schedule. The scope of this study is to investigate the importance levels of factors causes cost overrun in construction projects undertaken by construction companies. Eight factors named Design and Documentation Related Factors (DDF), Financial Management Related Factors (FIN), Communication Related Factors (ICT), Material and Machinery Related Factors (MMF), Human Resource Related Factors (LAB), Project Management Related Factors (PMCA), Contractors Site Management Related Factors (CSM), External Factors (EF) and their respective sub- factors are found to be responsible for cost escalation. Based on these above factors questionnaire was prepared and distributed 38 respondents. The data received from questionnaire survey was analyzed using Statistical Package of Social Science (SPSS) to carry out reliability test, hypothesis, correlation and ranking. The survey results indicated that Contractors Site Management Related Factors (RII=0.928), which is being most significant among the others that leads to delay in completion of the project and causes overrun.
Authors and Affiliations
S. Vaishnavi Devi, , Assistant Professor R Jegan
Online Student Attendance System
Today students’ attendance is become more important part for any institutions. In present system all work is done on paper. The whole attendance is stored in register and at the end of the session the report is generate...
slugA Survey on Techniques used for Detection and Tracking of Video Objects
Segmentation and tracking are two important aspects in visual surveillance systems. Many barriers such as cluttered background, camera movements, and occlusion make the robust detection and tracking a difficult problem,...
An Efficient File Retrieval from Cloud Servers Using Multi Keyword Sets
A Huge number of information proprietors have moved our information into cloud servers. Cloud information proprietors like to outsource archives in an encoded shape with the end goal of protection safeguarding. Hence it...
Intelligent Transport System
Due to increase in population there is a need for more transportation system. Because of the current system the traffic flow has greatly increased. Here we propose an intelligent traffic prediction system that captures...
Design and Simulation of Four Input Buck DCDC Converter using MATLAB/Simulink
DC-DC buck converters are used to step down the input DC voltage to maintain a required voltage in a renewable energy system. In this paper, we proposed four input buck DC-DC converter which can be used to improve effic...