COST ESTIMATION AND BUDGET PLANNING ACCURACY LEVEL OF REHABILITATION AND IRRIGATION NETWORK IMPROVEMENT PROJECT USING COST SIGNIFICANT MODEL

Abstract

Rehabilitation and Irrigation network improvement project activities is one of the budget codes containing inBudget Implementation List (DIPA) of Irrigation Institution in South East Districtusing unit price contract. Budget planning in the project is always set based on the experiences without using special method. So that it is required the certain method to find out the works affected in the project and existing budget planning accuracy level to reduce raising cost from the pre construction calculation using estimation price (HPS) before the project is tendered. The objective of this study is to identify the works that significantly affect the total project cost and to get cost model and project accuracy by using CSM Method.The result of this study shows that the stone masonry work (X4) is the most afected work to the budget planning in rehabilitation and Irrigation network improvement project as 74.90% to the works total cost. With the cost estimation accuracy level using Cost Significant Model is around (-11.72%) to31.31%, and accuracy level average is7.18%; the difference between CSM and HPS actual cost is Rp. 633,566,690 (1.07%) or CSM is bigger that HPS actual cost with the accuraci level is 6.92%.

Authors and Affiliations

HAFNIDAR A. RANI

Keywords

Related Articles

Comparative Study of Aroma Chemicals from Menthapiperita Via: Microwave Assisted Hydrodistillation, Solvent Free Microwave Extraction and Hydrodistillation Processes

Menthapiperita is one of the important traditional medicinal plants widely used in pharmaceuticals, cosmetic, food and flavor industries and belongs to the labiatae family. The plant in this family is widely used to impr...

TEMPORAL VARIATION OF GROUND WATER QUALITY IN CENTRAL GODAVARI DELTA AND ITS SIGNIFICANCE IN HYDRODYNAMICS OF THE AREA

Central Godavari Delta is a Crop Intensive rice bowl of Andhra Pradesh. The present study area covers 16 mandals of East Godavari District of Andhra Pradesh. To study the temporal variation of Chemical Quality in terms o...

Experimental Analysis on Treated and Untreated Grass/Carbon Hybrid Composite structures

Hybrid composites are having the greatest potential for engineers in many applications. A hybrid polymer composite offers the designer to obtain the necessary properties to in a substantial extent by the choice of fibers...

NUTRITIONAL ENRICHMENT OF KULFI BY INCORPORATING SOYA PROTEIN ISOLATES AND WHEY PROEIN CONCENTRATE

Soy protein is distinctive among the plant based proteins associated with isoflavones; the presence of phytochemical, with a variety of biological properties has potential benefits to human health. These proteins possess...

COMPARATIVE STUDY OF AROMA CHEMICALS FROM MENTHAPIPERITA VIA: MICROWAVE ASSISTED HYDRODISTILLATION, SOLVENT FREE MICROWAVE EXTRACTION AND HYDRODISTILLATION PROCESSES

Menthapiperita is one of the important traditional medicinal plants widely used in pharmaceuticals, cosmetic, food and flavor industries and belongs to the labiatae family. The plant in this family is widely used to impr...

Download PDF file
  • EP ID EP222283
  • DOI -
  • Views 90
  • Downloads 0

How To Cite

HAFNIDAR A. RANI (2017). COST ESTIMATION AND BUDGET PLANNING ACCURACY LEVEL OF REHABILITATION AND IRRIGATION NETWORK IMPROVEMENT PROJECT USING COST SIGNIFICANT MODEL. International Journal of Applied Engineering Research and Development (IJAERD), 7(2), 1-8. https://europub.co.uk/articles/-A-222283