Critical Path Method in the Network Analysis with Parametric Fuzzy Activity
Journal Title: IOSR Journals (IOSR Journal of Computer Engineering) - Year 2019, Vol 21, Issue 1
Abstract
In this paper, a method is presented to find fuzzy critical path using parametric interval valued function. Here network model has been developed in fuzzy environment. All activities are considered as a Trapezoidal fuzzy number. This fuzzy number has been transform as an interval number using Nearest Interval Approximation method. In this work, we develop a parametric interval-valued functional form of an interval number and then solve the parametric network problem. To illustrate the technique, an airport’s cargo ground operation system is considered here.
Authors and Affiliations
Debrupa Sen, Debolina Roy, Samir Dey
Design & Development of an Advanced Database ManagementSystem Using Multiversion Concurrency Control Model for aMultiprogramming Environment
Abstract: Multi Version Concurrency Control (MVCC) is a locking scheme commonly used by moderndatabase implementations to control fast, safe concurrent access to shared data. MVCC is designed to providethe followin...
Recognition of Human Iris Using Accurate Iris Map
Personal identification based on Biometrics technology is a trend in future. Iris Recognition is regarded as a high accuracy verification technology when compared to traditional approaches. In real-time Iris Rec...
Scalable parallel clustering using modified Firefly algorithm
Abstract: Clustering is the process of assigning data objects into a set of disjoint groups called clusters so that objects in each cluster are more similar to each other than objects from different clusters. We tr...
Comparative Study of PEGASIS Protocols inWireless Sensor Network
Abstract: The area of Wireless Sensor Networks (WSNs) is one of the fast growing and emerging field in the scientific and engineering world. It is an ad-hoc network that consists of small nodes with sensing, computing an...
Effective Modular Order Preserving Encryption on Cloud UsingMHGD
Abstract: Cloud computing strengthens its presence in the public sector, Organizations and individuals arelooking for cloud services to improve productivity, security and reduce costs. Apart from communication, filestora...