Critical pathway for primary open angle glaucoma diagnosis

Journal Title: International Journal of Ophthalmology - Year 2017, Vol 10, Issue 6

Abstract

"AIM: To develop a critical pathway for primary open angle glaucoma (POAG) diagnosis intended to be efficient, to unify criteria, reduce resource use and minimize costs to the health system. METHODS: We performed a systematic search on PubMed, Cochrane, Embase and ClinicalTrials.org databases and classified the quality of evidence from level I through III. RESULTS: A critical pathway was designed by setting a key-decision step by step model on the basis of the best current evidence. CONCLUSION: A critical pathway, evidence-based guideline, may be a useful tool intended to reduce costs while maintaining or even improving the quality of care for diagnosing a highly prevalent pathology such as open angle glaucoma."

Authors and Affiliations

Alejandro R. Allocco

Keywords

Related Articles

A review of paediatric vision screening protocols and guidelines

Vision screening plays an important role in the early detection of children who have or probably are predisposed to have specific visual problems. The validity and reliability of the screening batteries in relation to th...

A novel frameshift mutation in CX46 associated with hereditary dominant cataracts in a Chinese family

"AIM: To investigate the genetic mutations that are associated the hereditary autosomal dominant cataract in a Chinese family. METHODS: A Chinese family consisting of 20 cataract patients (including 9 male and 11 female)...

Anterior and posterior capsule densitometry levels after femtosecond laser-assisted cataract surgery

"AIM: To analyze and compare five different variables over one year follow-up (1wk, 1, 3, 6 and 12mo): anterior capsule (AC), and posterior capsule (PC) area densitometry values, AC and PC linear densitometry values, and...

Epidemiological, clinical and laboratory findings of infectious keratitis at Mansoura Ophthalmic Center, Egypt

"AIM: To analyze the epidemiological, clinical and laboratory findings of infectious keratitis. METHODS: A retrospective study on cases of infective keratitis, attended our institution from Mar. 2013 to Feb. 2015, was do...

Role of microRNA-21 in uveal melanoma cell invasion and metastasis by regulating p53 and its downstream protein

"AIM: To reveal the insight mechanism of liver metastasis in uveal melanoma, we investigated cell functions of microRNA-21 in three different uveal melanoma cell lines and analyze the relationship of target gene p53 and...

Download PDF file
  • EP ID EP602869
  • DOI 10.18240/ijo.2017.06.21
  • Views 55
  • Downloads 0

How To Cite

Alejandro R. Allocco (2017). Critical pathway for primary open angle glaucoma diagnosis. International Journal of Ophthalmology, 10(6), -. https://europub.co.uk/articles/-A-602869